My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2010 04 06
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2010 City Council Agendas and Packets
>
City Council Agenda and Packet 2010 04 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:05:01 PM
Creation date
4/13/2010 9:36:50 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
4/6/2010
Original Hardcopy Storage
6C2
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2010 04 06
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT <br />THIS AGREEMENT is made and entered into this ________day of ____________ in the year 2010 <br />by and between: <br />CITY OF LOUISVILLE, COLORADO <br />(hereinafter called OWNER) <br />and <br />PLM Asphalt & Concrete, Inc. <br />(hereinafter called CONTRACTOR) <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows. <br />ARTICLE1.WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br />PROJECT: 2010 PAVEMENT CRACK SEAL PROJECT <br />PROJECT NUMBER: 010-431-52210-02 <br />ARTICLE2.CONTRACTTIMES <br />2.1 The CONTRACTOR shall substantially complete all work by May 18, 2010 and within 30 <br />Consecutive Contract Days after the date when the Contract Time commences to run. The <br />Work shall be completed and ready for final payment in accordance with paragraph 14.13 of <br />the General Conditions within 40 Consecutive Contract Days after the date when the <br />Contract Times commence to run. The Contract Times shall commence to run on the day <br />indicated in the Notice to Proceed. <br />2.2 LIQUIDATED DAMAGES. The OWNER and the CONTRACTOR agree and recognize that <br />time is of the essence in this contract and that the OWNER will suffer financial loss if the <br />Work is not substantially complete by the date specified in paragraph 2.1 above, plus any <br />extensions thereof allowed in accordance with the Article 12 of the General Conditions. <br />OWNER and CONTRACTOR also agree that such damages are uncertain in amount and <br />difficult to measure accurately. Accordingly, the OWNER and CONTRACTOR agree that as <br />liquidated damages, and not as a penalty, for delay in performance the CONTRACTOR shall <br />pay the OWNER SEVENTY DOLLARS ($70) for each and every Contract Day and portion <br />thereof that expires after the time specified above for substantial completion of the Work until <br />the same is finally complete and ready for final payment. The liquidated damages herein <br />specified shall only apply to the CONTRACTOR’s delay in performance, and shall not <br />include litigation or attorneys’ fees incurred by the OWNER, or other incidental or <br />consequential damages suffered by the OWNER due to the CONTRACTOR’s performance. <br />If the OWNER charges liquidated damages to the CONTRACTOR, this shall not preclude the <br />OWNER from commencing an action against the CONTRACTOR for other actual harm <br />resulting form the CONTRACTOR’s performance, which is not due to the CONTRACTOR’s <br />delay in performance. <br />26 <br />2010 Pavement Crack Seal Project <br />íî <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.