THIS AGREEMENT is made and entered into this <br />between: <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows. <br />ARTICLE 1. WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br />PROJECT: 2010 FILTER CONTROL PANEL REPLACEMENT — NORTH WTP <br />PROJECT NUMBER: 051 -498- 55840 -28 <br />ARTICLE 2. CONTRACT TIMES <br />AGREEMENT <br />CITY OF LOUISVILLE, COLORADO <br />(hereinafter called OWNER) <br />and <br />ANYTHING ELECTRICAL, LLC <br />(hereinafter called CONTRACTOR) <br />day of in the year 2010 by and <br />2.1 The CONTRACTOR shall substantially complete all work by May 21, 2010 and within 33 <br />Consecutive Contract Days after the date when the Contract Time commences to run. The <br />Work shall be completed and ready for final payment in accordance with paragraph 14.13 of <br />the General Conditions within 40 Consecutive Contract Days after the date when the <br />Contract Times commence to run. The Contract Times shall commence to run on the day <br />indicated in the Notice to Proceed. <br />2.2 LIQUIDATED DAMAGES. The OWNER and the CONTRACTOR agree and recognize that <br />time is of the essence in this contract and that the OWNER will suffer financial loss if the <br />Work is not substantially complete by the date specified in paragraph 2.1 above, plus any <br />extensions thereof allowed in accordance with the Article 12 of the General Conditions. <br />OWNER and CONTRACTOR also agree that such damages are uncertain in amount and <br />difficult to measure accurately. Accordingly, the OWNER and CONTRACTOR agree that as <br />liquidated damages, and not as a penalty, for delay in performance the CONTRACTOR shall <br />pay the OWNER SIX HUNDRED DOLLARS ($600.00) for each and every Contract Day <br />and portion thereof that expires after the time specified above for substantial completion of <br />the Work until the same is finally complete and ready for final payment. The liquidated <br />damages herein specified shall only apply to the CONTRACTOR's delay in performance, <br />and shall not include litigation or attorneys' fees incurred by the OWNER, or other incidental <br />or consequential damages suffered by the OWNER due to the CONTRACTOR's <br />performance. If the OWNER charges liquidated damages to the CONTRACTOR, this shall <br />not preclude the OWNER from commencing an action against the CONTRACTOR for other <br />actual harm resulting form the CONTRACTOR's performance, which is not due to the <br />CONTRACTOR's delay in performance. <br />2010 Filter Control Panel Replacement — North WTP <br />26 <br />47 <br />