My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1973 07 03
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1973-1989 City Council Agendas and Packets
>
1973 City Council Agendas and Packets
>
City Council Agenda and Packet 1973 07 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:30:32 PM
Creation date
12/28/2009 3:25:23 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
7/3/1973
Supplemental fields
Test
CCAGPKT 1973 07 03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W► 'Alt :: , r.. ;rte .: '1.1 ; <br /> • <br /> • • <br /> PROGRAM FOR REDEVELOPMENT OF THE COD CORE AREA s.'; <br /> Louiavillft, Colorado <br /> CeD Core hjpe. <br /> I. Identify CBD Core Area as the area bounded by La Farge Avenue on the `rest, <br /> Front Street on the fir, South Street on the north and Pine Street on the <br /> south. <br /> II . Designate perimeter streets as follows: South Street, La Farge Avenue and <br /> Front Street - Collector; Pine Street - Arterial. <br /> GOALS AND OBJECTIVES FOR REDEVELOPMENT OF C80 CORE AREA <br /> 1. Develop off-street parking areas to provide additional parking spaces as <br /> they are required. <br /> A. Locate parking areas adjacent to perimeter collector streets La Farge <br /> Avenue and Front Street. <br /> B. Prevent access off the arterial street Pine Street. <br /> C. Develop parking areas where non-commercial land uses now exist. <br /> D. Allow for planting of trees in parking lot. <br /> 11 . Develop a pedestrian mall on Main Street from Pine Street to South Street <br /> and phase the development of the pedestrian mall into three stages: <br /> A. Stage I. <br /> 1. Construct new concrete sidewalk with brick paving panels incorporated. <br /> 2. Now sidewalk to be constructed would be two feet wider and within the <br /> two feet would be incorporated a covered drainage way along the new <br /> curb and gutter. <br /> 3. Construct tree planting islands adjacent to new curbs at intersections <br /> along Main Street in the CBD Redevelopment Core Area. Islands would <br /> be eight feet deep. <br /> 4. Install watering system (hydrants in each planting area) . <br /> S. Plant large caliper trees (honey locust, linden, flowering crab). <br /> 6. Locate light fixtures, benches, and trash receptacles in planting <br /> island areas. <br /> 7. Maintain parallel parking on Main Street and two-way traffic. <br /> 8. Construct at least one off-street parking lot before planting islands <br /> are constructed. <br /> 8. Stage 2. <br /> I . Reduce automobile - pedestrian conflict points. <br /> 2. Designate one-way streets as follows: Main Street - one-way going <br /> north from Pine Street to South Street; Spruce Street - one-way going <br /> east; Walnut Street - one-way going eas$ <br /> 3. Construct a second off-street parking lot. <br /> 4. Where parking lots have been constructed, relocate overhead utility <br /> wires underground and clean up back side of stores along alley. <br />
The URL can be used to link to this page
Your browser does not support the video tag.