Laserfiche WebLink
Co ' Ill ,• 4'4 <br /> Steps 3. • <br /> • <br /> I. Cioss Mis in Street 10 sutamob l is traffic emcept for rpency,eh icl a <br /> aooees and construct pedestrian mall. <br /> 2. Remove street paving and Introduce planting arwa and pedestrian sur- <br /> faces (preferably brick surface where possible). <br /> 3. Complete pedestrian sale lighting system. <br /> 4. Coordinate any store canopy construction (color, height, dimension). r, <br /> S. Coordinate graphics for entrance points to sell ores. <br /> D. Steps 4. <br /> I. Plant trees down the center of Spruce and WIa I nut Streets. <br /> 2.4 Prevent perking on these streets. <br /> 3. U.. the streets as drop-off areas only. <br /> eI <br /> I J <br /> ' c <br /> NOTES: 1. The closing of Main Street and construction of all could take p I ace <br /> In block stapes, possibly beginning on Mein Street from Spruce to <br /> Walnut. ' <br /> 2. Maintain rustic character in the COD Redevelopment Core Area (paving, <br /> lighting, signing, sitting areas end store front construction). <br /> 3. Eventually, the electrical lines that run along Spruce Street and <br /> Pine Strait should be relocated underground. <br /> • <br /> a <br />