Laserfiche WebLink
ii of <br /> ,.!late No. 3 Final of Work Done For Rex Street Storm Drain Project <br /> '%.:gh the 31stday of Mqy , 1919 Contractor l 6 I. Construction, Inc. <br /> Contract Total Work Total Work <br /> ..; Bid Reported on Done This Total Work Prices <br /> Quantity Unit Last Estimate Month Done to Date Per Unit Amount <br /> Remov Cur, and tt r 176 ,F 163 --- 163 J _4,�_I--65 .00 <br /> 1 , Remove Cross Pan 118 gm 118 -« 118 T�-T 8.501,- <br /> ,00 MAO <br /> 3 Remove Driveway and Sidewalk 89 OM 88 IIMI 88 - 6,50 51x.00 <br /> 4 i Remove Asphalt Pavement 122 CIIIEIIIIIIMIIM 343- -; -—5.04 T 1,115.k_ <br /> . ; Remove Sod 30(1 MEIN --- 341 3.20 T 1,091, <br /> Plug Culvert 1 gi 1 -.- 1 150.00 i 154,00 <br /> Excavate Drainage Ditch 1400 C,Y, 1 400 ! ► 1 400 2,50 , 3 500.40 <br /> Reset Sign Ea. 1 5 r-- 5 - —V 51100 , 25043 <br /> Reset Culvert 1111111111E11111111111111 ' - --- <br /> 43 � 1:89- T38x,tr <br /> :J , Relocate 8-Inch Water Line 1 Ea. 3 r•- I 3 1000.00 -1 3,000 0i <br /> :1 Relocate 4•Inch Water Line Ea. <br /> i " - -f--- <br /> ... 0 600.001 0,00 <br /> :2 ! Relocate 2•Inch Water Line Ea. r 2 I --- 4 400.00 800.00 <br /> :3 Relocate Water Service Line 8. --- 8 10.i 2 — <br /> _ . <br /> :4 , Reset Mailbox es - 1 0.00 , 50.00 <br /> 5 I Reset Fence 20 L.F. 0 r 15.0n <br /> O.- - rte_ <br /> r Adjust Valve Box 1 Ea. -•- <br /> 1 80.00 :�� <br /> :7 , Class 6 Aggregate Base 18 Ton 205,5 --- 2053 1 45.00 1 9,241,50 <br /> :3 HC' . Patching - Gr. E 55 Ton 106,2 -.- 106.2 66,00 1,009.20= <br /> �.) HBP - Overlay • Gr. E 91 Ton a 76,4 X6,4 41013132.40 - <br />