Sheet 2 of 2
<br /> . Tate No, 3 Final of Work Done For Rex Street Storm Drain Project
<br /> lugh the 31st day of P y , 19 79 Contractor L I L Construction, Inc.
<br /> • , Contract Total Work Total Work
<br /> Bid . Reported on Done This Total Work Prices
<br /> Quantity Unit Last Estimate Month Done to Date Per Unit Amount
<br /> 20 Emulsified Asphalt CSS-1 46 Lam 1,0 6,50 ,I
<br /> 21 Inlet • Type R 8 1311211111111 8 1750.00 14 y,i y
<br /> 22 Manhole - 5-Foot Diameter 2 Ellimilli111111111111 1250.00 ,,, 11
<br /> 23 15-Inch RCP Cl. III KA L.F. 95 _ --- 95 13,50 1•Z82. •
<br /> 24 15-Inch RCP Cl. IV 88 L.F. 91 w■r .7 13.50; 1 3/. ,
<br /> 25 15-Inch RCP Cl. v10 15.04 , , ,,,
<br /> 26 30«Inch RCP Cl, 11 IIMINIMIIMUMMIal 23'00! , 1
<br /> 21 30-Inch RCP Cl, 111 138 earlIMMEINIMI 25,00 2 ;1,1 ,.,
<br /> 78 36-Inch RCP Cl. I I 361 Mg 361 1191111n111 32.001 11 5 hs
<br /> 29 36-Inch RCP Cl. III 194 IN ; 33.00 , 11 ,
<br /> 30 36-Inch RCP End Section 111111131.11111 550`00 $5
<br /> 31 Concrete Sidewalk 44 43.50 2 305.5
<br /> �32 Concrete Driveway 33 S.Y. 36.22 --r 36.22 45,501 1,648,01 i
<br /> 33 1 Curb acid Gutter 128 L.F,
<br /> 1:., 16.50 . 1 I
<br /> 34 Fla99ing 24 ix 56 11.111.al 15,00 855.
<br /> 35 Project Sign MU D. 400.00 400,pp ,
<br /> r _ 1,40861
<br /> sco- N, . l. .
<br /> cco No, 2 (H8P-
<br /> 6r, E. x.) ton IIIMIIIIEMI 16,1 MO 76,40
<br /> 1111.11111111111.1111111111111111111111111111111111111 F-
<br /> rti11ed Correct: Total value as per above estimate to date. 99,183.65
<br /> 1 ' ' ' /4 Less 10 per cent of total amount to date. 9,918.37
<br /> .„EIIN!AL ENGINEERING, INC. Date S J/ r Less aeaunt previously paid. 85,778,86 .
<br /> proved for Payment A.D. 19 Total amount due and now payable. 3,486.42
<br />
|