Laserfiche WebLink
• 60 to 90 day process for three (3) recent projects: 701 Main, 808 Main and <br />637 Main. <br />• Examples from Wheat Ridge and Steamboat Springs <br />• Wheat Ridge allows all uses as an administrative review and a public <br />hearing only if opposition is received at a neighborhood meeting. <br />• Steamboat has specific SRU's eligible for Administrative Review. <br />Russ stated staff recommends following the Wheat Ridge model and include a <br />21 -day notification requirement. <br />Other discussion centered on the following questions fro - Commissioners: <br />• How many negative comments would initiate • sic hearing? Different <br />scenarios were discussed. <br />• Did staff review other Boulder County Co <br />with the suggestion. <br />• The wording of the criteria is worriso - taff clarified th- •rding came <br />from the CMRS SRU administrati - eria and would requ - Biting for <br />other SRU's. <br />• What type of vesting does the applic. - through this process? <br />• Would there be an appea • ocess avai : • after an Administrative SRU <br />approval? <br />Some type of fee structure • u • - - • to be - n ted. <br />If approved, then staff shoul®. ovi•- • on basis a summary <br />report to Planni • • missio h. •een administratively <br />approved. <br />It was the gener •nsensus • the Co , ssion for staff to proceed with a <br />recommendation. <br />Subdivis <br />Other topics <br />shelters throug <br />Development Des <br />ange Go. Projects / Activities <br />Planning Commission <br />Meeting Minutes <br />July 8, 2010 <br />Page 7 of 8 <br />ities , but will follow -up <br />Rus. - ewed th- 0 / * Work Plan Staff Report. Under the Emerging <br />Pro - topic, he a• ® • the t for Historic Preservation Commission which <br />inclu• - architectur: vent • of the homes in the Jefferson Place <br />the commissioners included: mass transit, bus <br />, clarity of the FasTracks project, and the Mixed Use <br />tandards and Guidelines (MUDDSG) within the Highway <br />42 Revitalization Area. It was stated they need background information for the <br />MUDDSG as well as a review of the design standard for ground floor commercial <br />and residential above. <br />The following items are tentatively scheduled for August 19, 2010 <br />➢ City Solar Panels — A special review use (SRU) request to install solar <br />panels at the three (3) water treatment plants owned and operated by the <br />City of Louisville. <br />