My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2010 09 16
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2010 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2010 09 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:11 AM
Creation date
9/29/2010 1:36:30 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2010 09 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Staff r <br />co <br />• Subject property is within the 100 year floodplain. The applicant was <br />granted a floodplain development permit by the Louisville Board of <br />Adjustment in August 2008. <br />• The facility will consists of six (6) separate buildings, housing <br />approximately 300 storage units, space for portable storage containers on <br />top of the storage buildings and 1,640 SF office. <br />• The site will be surrounded by an architectural wall which will screen the <br />majority of the storage activities from the public view. <br />• The facility and pavement will over 69.4% of the 129 280 SF property. <br />Maximum coverage permitted by the IDDSG is 75° <br />• All of the structures associated with the facility - he IDDSG setback <br />requirements. <br />• Access will be from two (2) separate locati• •ff • pire Road and will <br />be 187 feet apart. <br />• There will be 10 surface parking spa <br />which will meet the parking requir <br />• Parking for the storage units will <br />• Empire Road will be reconfigured to <br />adjacent to the property. T ese improv <br />applicant as part of the d- - • ® ent. <br />• A landscape buffer will be <br />adjacent to the Harney Last <br />meets the IDDS <br />. The site has <br />public view <br />• Staff is r <br />side of the <br />on t orthe <br />me <br />s: <br />for to issuan <br />n documen' <br />ation ditc <br />aban <br />th <br />agre <br />uireme <br />ed to <br />the south si <br />Planning Commission <br />Meeting Minutes <br />August 19, 2010 <br />Page 5 of 17 <br />the facility, <br />driv_- les interns he site. <br />to a six (6) foo shoulder <br />will be completed by the <br />long th- • thern side of the property <br />posed site landscape <br />the in - •r operations from the <br />mited to one sign on the southern <br />ern side. Staff recommends no sign <br />or Resolution No. 17, Series 2010 with the following <br />building permit, the applicant will provide <br />on co firming that the parties who have water rights in <br />n the south side of the property have abandoned or <br />ent of the irrigation ditch, or otherwise have <br />consen -® • ®UD improvements affecting the ditch. <br />2. The owne execute a development agreement for this PUD. The <br />development agreement will stipulate that maintenance of all drainage <br />improvements located in City of Louisville right of way will be the <br />responsibility of the owner. <br />3. The development agreement will stipulate that maintenance of the private <br />sewer line located on City of Louisville property will be the responsibility of <br />the owner. <br />4. Prior to completion of foundation inspection for any foundations for the <br />storage facility, the applicant will provide a FEMA elevation certificate <br />
The URL can be used to link to this page
Your browser does not support the video tag.