Laserfiche WebLink
2. Minimum electrical and hardware requirements for <br />EVSE Installed, EV Ready, and EV Capable are set forth in Chapter 15.18 <br />of the Louisville Municipal Code. <br />3. Minimum Charging Rate. Each installed EVSE shall <br />comply with one of the following: <br />a. Be capable of charging at a minimum rate of 6.2 <br />kVA (or 3OA at 2O8/24OV). <br />b. When serving multiple EVSE installed spaces <br />and controlled by an energy management system providing load <br />management, be capable of simultaneously sharing each EVSE <br />installed space at a minimum charging rate of no less than 3.3 kVA. <br />Residential 1 lses <br />Single Fvni1y un-if <br />—Multi Family unit, with dedicated <br />narking emcee or garages <br />Tier 1 <br />Multi_Family without dedicated <br />0 <br />parking spaces or garages <br />Hotel, Motel, Extended Stay <br />Lodging Facility <br />Tier 2 Employment oriented uses <br />BIc/ness d anProfessional Offices <br />Generalalllresearch facilities, light <br />+nduotrial facilities including <br />manufacturing, a-sembly, warehouse <br />and fabrication <br />Hospital <br />Tier Service and Sales oriented <br />uses <br />Private and public recreational and <br />lodges, and fraternal organization: <br />Religiouo inotitutisn <br />Commercal amuocmcnt, indoor <br />and outdoor <br />Schools, including public, private, <br />vocational or buciness <br />EV Installed EV Ready EV Capable <br />1 space <br />1 space <br />1 space <br />1 space <br />10% of 10% of 50% of <br />spaces spaces spaces <br />7% of spaces <br />5% of spaces <br />10% of 15% of <br />spaces spaces <br />10%of 10%of <br />spaces spaces <br />Ordinance No. 1877, Series 2024 <br />Page 4 of 7 <br />