My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revitalization Commission Agenda and Packet 2025 02 03 - Special Meeting
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
REVITALIZATION COMMISSION
>
2025 Revitalization Commission Agendas and Packets
>
Revitalization Commission Agenda and Packet 2025 02 03 - Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 8:31:46 AM
Creation date
3/26/2025 4:32:49 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
2/3/2025
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rtfl <br />SCOPE OF WORK <br />Project Name: Town of Louisville — PULSE project — Phase 1 <br />RVi# P25000151 <br />Client Name: Town of Louisville <br />Client Address: 749 Main Street, Louisville, CO 80027 <br />Based on conversations with the City of Louisville Staff, the project will be phased as outlined below. Two bid packages will be <br />provided out into the following areas based on the recommendations outlined in the Downtown Vision Plan: <br />1A Bid Package: <br />• Relocated parking from existing parking lot at Steinbaugh Plaza site to South Street <br />• Diagonal to parallel re -striping on South Street to compensate for parking loss. <br />• Wayfinding — key monument signage in areas where phase 1 B distrurbance is minimal. <br />1B Bid Package <br />• Steinbaugh Plaza <br />• Front Street <br />• Main Street <br />ARTICLE 1. BASIC SERVICES <br />The Consultant shall provide, for the Basic Fee plus reimbursable expenses, services described in the following phases. <br />The scope is broken out in the following categories: <br />• General Services and Project Management <br />• Concept Design (phase 1 extents) <br />• Design Services <br />• Engineering Services During Construction <br />1.1 (TASK 01) DATA COLLECTION. GENERAL SERVICES AND PROJECT MANAGEMENT (PROJECT MANAGEMENT <br />PLAN) <br />This initial phase of work is critical in developing a clear plan for executing the project, begin investigations into existing conditions <br />and establishing initial contact and communication among property/business owners, key stakeholders, City Departments and other <br />agencies. RVi's project management tasks will also carry through the entire project. <br />DATA COLLECTION <br />Data Collection work will begin immediately following contract execution. Final Documentation of work will be complete prior to <br />initiating the Design Services phase of work. Documents will consist of Topographic Survey, Geotechnical Report, SUE Plans, <br />Floodplain Assessment. Private Dry Utility coordination and further coordination with BNSF Railroad will continue to occur at this <br />phase, with memos and updates provided throughout project. <br />DELIVERABLES: <br />1. Project Schedule <br />2. Project Issues/Goals/Objectives <br />3. Utilities and Infrastructure <br />4. Control Survey (CDOT 400 Series) <br />5. Mapping ROW / Tie-ins <br />6. PLSS Control (CDOT 400 Series) <br />7. Land Survey Control (CDOT 400 Series) <br />8. Tabulation of Properties (CDOT 200 Series) <br />Town of Louisville I Town of Louisville — PULSE project — Phase 1 I P25000151 <br />RVi Planning + Landscape Architecture • www.rviplanning.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.