My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-71
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2025 Resolutions
>
Resolution 2025-71
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 12:09:41 PM
Creation date
9/19/2025 11:08:48 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
APPROVING AN AGREEMENT WITH KIMLEY-HORN & ASSOCIATES FOR THE SOUTH STREET UNDERPASS PROJECT — OPTION B DESIGN
Meeting Date
9/16/2025
Doc Type
Resolution
Signed Date
9/16/2025
Ord/Res - Year
2025
Ord/Res - Number
71
City Property Name
Properties Underpasses
Quality Check
9/19/2025
Supplemental fields
Parties Involved
Kimley-Horn And Associates Inc
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Kimley»>Horn <br />Deliverables <br />• Drainage Report (60%, 90%, Final, Bid) <br />Page 11 <br />Task 2.D Irrigation Ditch Realignment <br />Kimley-Horn will prepare design calculations for the realignment of the open channel irrigation ditch along <br />the east side of CO-42. This will consist of coordination with Boulder County, comprehensive design <br />calculations alongside detailed construction documents. Kimley-Horn will finalize key alignments and <br />hydraulic calculations, ensuring an efficient flow and optimal performance. This stage will also encompass <br />a thorough assessment of environmental impacts and necessary regulatory compliance that will be <br />completed the environmental team as part of Task 4. <br />Kimley-Horn will refine these calculations in the 90% design phase, integrating relevant construction details <br />and specifications. The construction documents will provide clear guidelines for the execution of the <br />realignment. <br />Additionally, Kimley-Horn will prepare SWMP plans for the ditch realignment which will consist of initial, <br />interim, and final conditions along with a report on revegetation and seeding specifications. <br />See Task 4.A.1, Design Review, for submittal and review details. <br />Deliverables <br />• Construction Documents (60%, 90%, Final, Bid Set) <br />• SWMP Plans and Report (60%, 90%, Final, Bid Set) <br />Task 3 Framework and Conceptual Design <br />Kimley-Horn, RE:Land, and Otakwill complete an alternatives analysis to determine the preferred alignment <br />and associated improvements of the pedestrian underpass for up to three (3) alternatives. These <br />alternatives will be prepared to provide the desired grade -separated pedestrian crossing of C042 while <br />maintaining an access to the Delo subdivision from C042 south of Short Street, making use of the privately <br />owned parcel north of South St. The team will consider previously completed analysis and design <br />considerations to inform the Alternatives Analysis. <br />Task 3.A Framework (15%) Plans <br />Based on the City's goals, requirements, and criteria, The Team will complete a Conceptual Sketch Plan <br />to study circulation and scope extents for up to three (3) alternatives. The Team will meet with the City to <br />review and select up to two (2) alternatives to be advanced to Framework (15%) Plans for review and <br />selection with the City and for stakeholder approval. The Framework (15%) Plans are anticipated to consist <br />of the following: <br />• Site Programming + Land Use Areas Development; <br />• Land Use + Open Space Metrics; <br />• Preliminary Circulation + Parking Development; <br />• Preliminary Walls, Hardscape Materials + Planting Zones Diagram; and <br />• Preliminary Plan Overview Report. <br />Order of magnitude costs will be considered at the Framework Plan level. A detailed Engineer's Opinion of <br />Probable Construction Costs (EOPCC) will not be prepared at the Framework Plan level. <br />kimley-horn.com <br />11800 Ridge Parkway, Suite 200, Broomfield, CO 80021 <br />303 228 2300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.