Kimley»>Horn <br />Deliverables <br />• Drainage Report (60%, 90%, Final, Bid) <br />Page 11 <br />Task 2.D Irrigation Ditch Realignment <br />Kimley-Horn will prepare design calculations for the realignment of the open channel irrigation ditch along <br />the east side of CO-42. This will consist of coordination with Boulder County, comprehensive design <br />calculations alongside detailed construction documents. Kimley-Horn will finalize key alignments and <br />hydraulic calculations, ensuring an efficient flow and optimal performance. This stage will also encompass <br />a thorough assessment of environmental impacts and necessary regulatory compliance that will be <br />completed the environmental team as part of Task 4. <br />Kimley-Horn will refine these calculations in the 90% design phase, integrating relevant construction details <br />and specifications. The construction documents will provide clear guidelines for the execution of the <br />realignment. <br />Additionally, Kimley-Horn will prepare SWMP plans for the ditch realignment which will consist of initial, <br />interim, and final conditions along with a report on revegetation and seeding specifications. <br />See Task 4.A.1, Design Review, for submittal and review details. <br />Deliverables <br />• Construction Documents (60%, 90%, Final, Bid Set) <br />• SWMP Plans and Report (60%, 90%, Final, Bid Set) <br />Task 3 Framework and Conceptual Design <br />Kimley-Horn, RE:Land, and Otakwill complete an alternatives analysis to determine the preferred alignment <br />and associated improvements of the pedestrian underpass for up to three (3) alternatives. These <br />alternatives will be prepared to provide the desired grade -separated pedestrian crossing of C042 while <br />maintaining an access to the Delo subdivision from C042 south of Short Street, making use of the privately <br />owned parcel north of South St. The team will consider previously completed analysis and design <br />considerations to inform the Alternatives Analysis. <br />Task 3.A Framework (15%) Plans <br />Based on the City's goals, requirements, and criteria, The Team will complete a Conceptual Sketch Plan <br />to study circulation and scope extents for up to three (3) alternatives. The Team will meet with the City to <br />review and select up to two (2) alternatives to be advanced to Framework (15%) Plans for review and <br />selection with the City and for stakeholder approval. The Framework (15%) Plans are anticipated to consist <br />of the following: <br />• Site Programming + Land Use Areas Development; <br />• Land Use + Open Space Metrics; <br />• Preliminary Circulation + Parking Development; <br />• Preliminary Walls, Hardscape Materials + Planting Zones Diagram; and <br />• Preliminary Plan Overview Report. <br />Order of magnitude costs will be considered at the Framework Plan level. A detailed Engineer's Opinion of <br />Probable Construction Costs (EOPCC) will not be prepared at the Framework Plan level. <br />kimley-horn.com <br />11800 Ridge Parkway, Suite 200, Broomfield, CO 80021 <br />303 228 2300 <br />