Laserfiche WebLink
Figure 4: OSAB 2023 Candidate Open Space Ranking Map <br />• <br />1-High Priority <br />2-Medium Priority <br />3-Low Priority <br />Not a priority at this time <br />Public Lands <br />Map Updated: October 31, 2023 <br />The current GDP includes building setback notes requiring a minimum 50' setback for <br />one and two-story buildings and 100' setback for three-story buildings along the north <br />boundary of the development, and a 75' setback along the northwest boundary of the <br />development. As part of the public dedication of Lot B, the applicant requests that these <br />setbacks be modified to be 5' for parking and drive aisles and 20' for buildings. When <br />taken together with the public land dedication area, the minimum setbacks would be <br />increased from the adjoining residential development to the north. <br />Figure 5: Existing and Proposed Setback Notes <br />tTIA PROPER, <br />J EGN!4 .REEK ON <br />Existing GDP \ / <br />iDICATION1 <br />AC <br />FLINRE <br />I♦ <br />EXPANSION <br />BASIN DRAINAGE <br />— STORYY DEVELOPMENT <br />t <br />i� <br />I—OURRENT, mPROPERTYBouNmm <br />ALONG GOAL GREEN SUEDIVISION <br />Proposed GDP <br />—FEE <br />DEDICATION] <br />MAC <br />LOT 2 <br />PLANNING AREA <br />HIGH -DENSITY 20NE <br />FEE DEDICATION <br />10 AC <br />FERIAE <br />PARKING <br />EXP.SION <br />ALONG COAL CREEK GLGDNIBIGN <br />.—CURREN1 NOR. PROPERTY BOUNIDART' <br />—tDp-0' BUILDING SEIOnCK `�I <br />ZvR ESN, <br />PPNER . w <br />FOIE � l C Z <br />iY <br />TLVIEII •NiN <br />/ <br />FEE DEDICATION <br />10 AC <br />LOT C <br />FEE DEDICATION <br />5 AC <br />POWER <br />TOWER <br />7 <br />FUTURE — <br />PARKING <br />EXPANSION <br />Ig <br />i <br />PLANNING AREA <br />(FUTURE PHASE( <br />4.3 AC <br />LOT 2 <br />PLANNING AREA <br />NIO4ENSDY ZONE <br />1.7 AC <br />Wiz PLANNING AREA <br />Nan! (FUTURE PHASE( ISE+BACK <br />2.2 AC <br />ziz <br />i <br />i <br />). <br />LOT 7 <br />