City Council <br /> Meeting Minutes <br /> April 17, 2012 <br /> Page 5 of 7 <br /> The initial design for the awning called for a manually retractable awning system and <br /> included some static sections that would require installation each spring and removal <br /> and storage each fall. <br /> After further discussions with both awning manufacturers and contractors, staff and the <br /> project architect included an addendum to the request for bids asking for the price to <br /> include a mechanically retractable system because it allows the system to be put on a <br /> wind sensor so that it will automatically roll up if the wind hits a predetermined level; it <br /> will not require any staff time to install and remove awning panels each year; it is self <br /> contained when rolled up and will not require any additional storage space and it takes <br /> the human factor out of the system when rolling the awning in and out thereby causing <br /> fewer chances for problems. As City staff is not on site for most events at the pavilion, <br /> this solves the problem. The Whitestone Construction bid for the manual system was <br /> $49,979.42. Adding the mechanical system option of $8,000.00, would bring the total to <br /> $57,979.42. Total cost of the project is expected to include: $57,979.42 — base bid plus <br /> mechanically retractable awning; $ 2,900.00—contingency and $ 1,200.00 for <br /> geotechnical evaluation of the soils for boring for a total of $62,079.42. <br /> The budget for this project is $36,000. Staff is requesting an additional $26,000 to be <br /> appropriated from the Capital reserves on May 1 when Council determines the budget <br /> amendment. The Finance Department has determined there is enough in the capital <br /> reserves to cover this additional cost. <br /> The DBA is unable to contribute funds to help with the additional cost of the project due <br /> to a decline in their sponsorships this year. However, they have worked with City staff to <br /> improve compliance with sales tax collection from vendors who participate in the Street <br /> Faire. Staff believes improved sales tax collection, increasing the Street Faire from 9 to <br /> 10 performances, and a lineup of musicians with even more power to attract large <br /> audiences than in past years will result in higher sales tax revenue this year. Staff has <br /> also increased the fees for renting the Pavilion. These anticipated increases in revenue <br /> will over time, at least partially offset the unanticipated and unbudgeted costs for the <br /> retractable awning. Staff recommended approval of the contract not to exceed <br /> $57,979.42 with Whitestone Construction, Inc. for the installation of the Steinbaugh <br /> Pavilion Retractable Awning. <br /> COUNCIL COMMENTS <br /> Council member Jasiak asked if the project had a lighting component. Public Relations <br /> Manager Muth explained there is no lighting component, but can be added at a later <br /> time. <br /> Mayor Muckle inquired about the expected life span of the awning. Public Relations <br /> Manager Muth stated it had a ten-year life span. <br /> PUBLIC COMMENT <br />