My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2013 06 27
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2013 City Council Minutes
>
City Council Minutes 2013 06 27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:44:34 PM
Creation date
8/7/2013 7:58:17 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
6/27/2013
Original Hardcopy Storage
7D4
Supplemental fields
Test
CCMIN 2013 06 27
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Budget Retreat <br />Meeting Minutes <br />June 27, 2013 <br />Page 7 of 13 <br />Complex. He explained the reason the cost of the project was reduced is the cost of <br />synthetic turf has gone down. <br />She questioned the renovation of the Inline Hockey Rink and requested demographics <br />establishing the need for an Inline Hockey Rink. Parks and Recreation Director Stevens <br />explained survey results indicate this would be used by youth organizations. They are <br />also looking at reinvesting in Tennis Courts for Pickle Ball based on requests from the <br />aging populations. He explained this is a cross between tennis and badminton. <br />She asked Parks and Recreation Director Stevens to explain the increase in the cost for <br />bathrooms at the Arboretum. Parks and Recreation Director Stevens explained after <br />discussions with the Horticulture and Forestry Board, it was decided the bathroom <br />facility should be more centrally located. Due to its close proximity to the All- Purpose <br />Sports Field and the Skate Park the project is being upsized for a higher concentration <br />of use. <br />She asked if the cost of the Washington /McCaslin underpass has gone up or whether <br />the cost was always $1.5 million dollars. City Manager Fleming stated the cost has <br />always been $1.5 million dollars, part of which are for design funds and part for <br />construction funds. <br />She asked if the $1.5 million dollars included landscaping. CIP Manager Trettin <br />explained the bids have gone out and Council will be asked to consider a contract. <br />Council member Jasiak commented on the redevelopment of the parks and reported <br />hearing from mothers about the functionality of parks with respect to children. They <br />report Community Park is not particularly functional in comparison to Heritage Park. <br />Parks and Recreation Director Stevens favored a public process such as a charette, <br />where adults and children can comment on the design and the types of equipment. He <br />noted one of the City's Parks Project Manager strength's is playground design and in <br />particular compatibility within the environment and the surrounding neighborhoods. <br />Mayor Muckle inquired if the Departmental CIP Budget submittal process differed from <br />previous years. Finance Director Watson explained the individual request sheets were <br />exactly as submitted by the department. City Manager Fleming's changes appear in red <br />on the summary sheets. <br />Council member Loo addressed the $72,000 City Bike Share Program proposed in <br />2015. City Manager Fleming stated it had been removed from the budget. <br />Council member Loo commented the City does not have enough dog parks and if an <br />opportunity arises she suggested the City go forward. She inquired about the Library's <br />CIP request for Library room study space. Library Director Barrett explained there is <br />much demand for study rooms. <br />
The URL can be used to link to this page
Your browser does not support the video tag.