My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2014 01 28 SP
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2014 City Council Minutes
>
City Council Minutes 2014 01 28 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:44:35 PM
Creation date
2/19/2014 8:31:59 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
1/28/2014
Original Hardcopy Storage
7D4
Supplemental fields
Test
CCMIN 2014 01 28 SP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br /> Special Meeting Minutes <br /> January 14, 2014 <br /> Page 5 of 15 <br /> • Delay Golf Course Reconstruction <br /> • Delay Gateway Underpass Construction <br /> The total savings of delaying CIP Projects in Package 1, 2 and 3 in 2014 is $9,681,800. <br /> He reviewed the affects of Package 1, 2 and 3 Models on the General Fund Forecast; <br /> Open Space & Parks Fund Forecast and the Capital Projects Fund Forecast. He <br /> explained if there is a major disaster there is a way to delay CIP projects. City Manager <br /> Fleming requested Council discussion on the 3 Packages presented. <br /> COUNCIL COMMENTS <br /> Mayor Pro Tem Dalton was comfortable with the general fund reserves going down to <br /> the minimum. He felt the City is somewhat gun shy about disasters having just <br /> recovered from one. His comfort level was a 15% general fund reserve level. He was <br /> not uncomfortable with the Capital Fund Balance going down to zero in 2014 because <br /> he knows the City never spends the entire CIP budget. <br /> Mayor Muckle agreed with the comments voiced by Mayor Pro Tem Dalton. He was not <br /> in favor of taking out the larger projects and felt it would be an irresponsible lack of <br /> spending. He was not in favor of delaying the reconstruction of the golf course project <br /> two years. He stated he does not want to delay the City Services Facility, but options <br /> are available to the Council. <br /> Council member Stolzmann disagreed and was not comfortable with going to the <br /> minimum general fund reserves because it represents less than two months of the <br /> City's ability to pay bills. She reviewed the 2012, 2013 and 2014 budgets. In 2012 <br /> Council proposed between 2013 through 2016 to spend $1.5 million on streets. This <br /> year streets are budgeted for $1.25 million, making it $250,000 under the targeted <br /> amount. She wanted to some make sure there is a distribution of money for streets <br /> though out the City and the residents have basic services. She did not understand the <br /> funding for the City Services Facility. She stated if all the money goes to the CIP Fund, <br /> it makes the picture look much worse than it is and more money needs to be transferred <br /> out of the General Fund into the Capital Fund projects. <br /> Council member Loo asked if the base model reserve in Package 1 gives the City two <br /> or four months of funding. City Manager Fleming explained when speaking in terms of <br /> two months, it assumes no revenue is coming in and spending continues as anticipated. <br /> Council member Loo stated if disaster struck would there be drastic measures taken <br /> such as closing the library or reducing hours of the recreation center. City Manager <br /> Fleming stated if disaster struck every CIP project would be put on hold. <br /> Mayor Muckle asked about the average minimal reserves and the thought behind such <br /> reserves. <br />
The URL can be used to link to this page
Your browser does not support the video tag.