<br />rest of the work. Dennis Maloney will check if the problems noted in his <br />survey were relevant to the Golf Course and should be included in the design. <br /> Jeff Cordes addressed the discrepancies between the items listed in their <br />Construction Services Agreement and Kevin Norby’s hole-by-hole plan. All <br />items were answered in the latest version apart from <br /> Costing the new forward tee on Hole #2 <br />o <br /> Some prices were still included for tree work. Joe Stevens advised <br />o <br />that this would be part of the Tree Removal and Maintenance Plan <br />and should not be part of the LU cost <br /> The Board discussed the various costed items in the LU Estimate in general <br />descending order of cost: <br /> The Board expressed concern that there was no costing detail for the <br />o <br />largest single cost item – replacement of the Irrigation System. Both Joe <br />Stevens and Jeff Cordes stated that sufficient due diligence had been <br />done with Brian Keighin on this and the $2.12M number could be <br />considered safe. It was noted that the $2.19M number showed a 3% <br />increase from the $2.06 number quoted in December. It was also noted <br />that the cost of replacing the Booster Pump had increased by a significant <br />amount from the prior replacement in early 2013. It is possible that FEMA <br />will cover 100% of the cost or relocating the booster pump out of the flood <br />plain. <br /> Jeff Cordes noted that results from core sampling of the greens had not <br />o <br />been received. If green remediation needs work on more than the top 4” <br />of soil, the price could significantly increase – hopefully within the amount <br />of the contingencies. <br /> There is a lump sum allowance of $485K in the LU estimate to cover <br />o <br />Stream Channel work, this covers the items related to bridge abutments <br />etc. in the Hole by Hole Analysis but is liable to change based on <br />requirements from the Army Corps of Engineers. <br /> The estimate for Pond Dredging in the estimate is very tentative. <br />o <br /> There are contingencies in the estimate for Owner $255K and Contractor <br />o <br />$200K which are considered conservative. <br /> The estimate contains $52K for Earthwork. This is fixing swales etc. <br />o <br /> There is no line item in the estimate for fixing the parking lot. Since this <br />o <br />should be covered by FEMA, the cost of this will be substantially mitigated <br /> The Board reviewed the items in the Maintenance/Contingency/Allowance <br />Section of the Estimate <br /> The Board’s opinion is that the $250K identified for Maintenance Building <br />o <br />Improvements is non-urgent and should be deferred <br /> Items relating to tree work are not part of the LU remit <br />o <br /> The fountain in the pond on Hole 8 is a luxury and should be deferred <br />o <br /> <br />·· <br />Parks and Recreation Department 749 Main Street Louisville, CO 80027 <br />· <br />(303) 335-4735 FAX (303) 335-4738 <br />www.louisvilleco.gov <br />Parks Recreation Senior Services O <br />Golf <br />12 <br />