Laserfiche WebLink
City Council <br />Special Meeting Minutes <br />April 22, 2014 <br />Page 3 of 5 <br />COUNCIL COMMENTS <br />Mayor Pro Tem Dalton stated the original site of the City Services Facility was too small <br />and the property in CTC was identified where commercial design guidelines applied. <br />He voiced his frustration with the process. City Manager Fleming confirmed the <br />anticipated cost for the facility has gone up. He noted all of the other sites if usable, <br />would have cost more. <br />Council member Keany inquired if the structure was closer to CTC Boulevard would the <br />facility be within the industrial standards. Planning Director Russ explained even if the <br />structure was shifted it would still be within the commercial zoning. He addressed the <br />resale value of the industrial and commercial portions of the property. <br />Council member Keany recollected the estimate of building on the existing shop facility <br />site was $8 million. Tom Wiener, RNL Design, indicated the original cost estimate at <br />the existing shop site was $9.7 million. City Manager Fleming explained the new site <br />estimate of $12.7 million included the land and the structure. <br />Council member Keany estimated the increase over the existing facility to be a 30% <br />increase. He voiced his support for the City Services Facility, but was disappointed by <br />the process. <br />Council member Lipton noted projects are going to increase in cost. He stressed the <br />importance of making sure the City get maximum value as the project moves forward. <br />Mayor Muckle agreed and noted there are a variety of reasons the cost of the facility <br />has increased, but it provides a long -term value to the City. He was comfortable going <br />forward and noted the City has tried to build this facility for decades. <br />Mayor Pro Tem Dalton voiced his unwavering support on the facility, but disappointment <br />with the process. <br />Council member Stolzmann inquired about the percentages of efficiencies, which will be <br />realized by the new facility. City Manager Fleming explained the key savings will be 5% <br />to 15% and the ability to keep the existing facility open while the new facility is being <br />built. There will also be additional space to maneuver vehicles. <br />Council member Stolzmann noted the Cultural Council has requested public art be <br />included in the project. She felt all the City's projects should be prioritized. She stated <br />there has been poor oversight in this project and disagreed with the change orders. She <br />stated there was no excuse for buying the property to build a garage and meeting <br />commercial standards. She felt the City Service Facility should be functional. <br />Council member Loo felt the design should provide safety for the people who work in <br />the building and have functionality. Having served on the Planning Commission she <br />