My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2014 12 10
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2014 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2014 12 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:24 AM
Creation date
12/15/2014 11:46:43 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2014 12 10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Five -Year Capital Improvement Program <br />Request for Capital Equipment or Capital Improvement Project <br />Project or Equipment Identification <br />Project Name. Irrigation Controller Replacements <br />Version of Request: 1- Apr -14 <br />Submitting Department!Division: Parks & Recreation <br />l Impacted Departments/Divisions: Parks & Recreation <br />Funding Source(s): Percent <br />, open Space a Parks Fund 100% <br />1TntaI Funding <br />1 Depa rime nt Priority <br />100% <br />12 <br />Equipment or <br />Project Costs <br />Land Acquisition <br />Design & Engineering <br />Other' Prot Services <br />Construction <br />Other <br />Capital Equipment <br />Total Project Costs <br />Granl(sj or Other <br />Project Revenue <br />Impact to Annual <br />MaintiOp Costs <br />Year 1 <br />Estimated Expenditure Schedule <br />Year 2 <br />Year 3 <br />Year 4 <br />Year 5 Five -Year <br />2015 2016 2017 2018 2019 Total <br />Beyond <br />5 Years <br />• <br />15,000 <br />15,000 <br />50,00e <br />50,0130 <br />50,000 <br />50,000 <br />50,000 <br />50,000 <br />50,000 <br />50,000 <br />215,000 <br />215,000 <br />45,000 <br />45,000 <br />250 <br />250 <br />250 <br />250 <br />1,000 <br />Project Location Map, Equipment Identification Photo, or Other <br />— _ = - <br />Project or Equipment Description and Justification <br />Please provide a general project description and include the cost allocation methodology if <br />more than one funding source is requested: <br />Park and median irrigation controller upgrades. <br />Please describe why this project is needed, how it supports City -wide goals and objectives, <br />what realistic options or alternatives have been considered, and what payback. or return an <br />investment, has been calculated: <br />the City of Louisville manages the water use at parks and medians through the use of a central control <br />system. Central control enables the irrigation manager to input all change to watering schedules through <br />one computer which in turn sends the data or schedule changes to each ansite irrigation controller via a <br />radio frequency. The City has close to 10D onsite irrigation controllers. Central control makes it possible <br />to make a simple city wide schedule change. For example, shutting off the waterin the City can be <br />accomplished by one simple click versus the previous way of having to make the change to each ensire <br />controller. <br />The City bought into the sentinel centrai control System Vase his ten years ago. At the time, as a way to <br />get into the program a little cheaper Sentinel oftered a retro -link card option for install in currently owned <br />controllers. This enabled the City to buy into the program without having to buy all new clocks. <br />As time has progressed the older clocks with the retro -link cards are kysing support from Sentinel. <br />Communication issues with these older clocks are becoming more common and solutions to remedy are <br />becoming less available. <br />The City has 52 of these older docks with retro•link cards. With the average cost of approximately $5,000 <br />this CIP program allows for the replacement of 3 critical clock replacements in 2015 and 10 clocks annual <br />for the remaining years until the 52 are replaced with all new Sentinel clocks. <br />Please provide a description of any grants andior other revenue associated with this project <br />and the ongoing operational and /maintenance costs associated With this project. <br />Maintenance costs should be minimized with new clocks. <br />19 <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.