05/05/87 <br />Services for the Treated Water Storage Tank <br />Project subject to Boulder County Commissioner's <br />affirmative review of the Special Review Use Site <br />Application. <br />Phare stated that the difference in the cost of <br />the two proposals (KKBNA, $68,600; and Rocky Moun- <br />tain Consultants, $128,997) for professional <br />engineering services for this project is "clearly a <br />different level oi: effort anticipated in order to <br />complete the project and bring that tank on line. <br />Some of the major differences in how the two firms <br />approached it was the level of inspection services <br />anticipated during the construction of the tank and <br />pipeline. The RMC: proposal had approximately twice <br />the manhours devoi:ed to that. The RMC proposal was <br />also more detailed in their soils analysis and it <br />was also proposing to complete corrosion analysis, <br />corrosion system clesign and corrosion system <br />testing based on their experience on the 60" Mar- <br />shall waterline acid they felt that thats critical <br />in that area." "T'he Public Works' opinion is that <br />the RMC proposal reflects more accurately the <br />effort of work, completeness, etc., that we anti- <br />cipate that this i:ype of project should have." <br />Szymanski asked about the RFP's that Public Works <br />designed for solicsiting proposals. Phare <br />explained that they RFP was a two page proposal <br />that identified in broad terms the level of effort <br />and the scope of work that was needed for this <br />project. Essentially, it asked of the bidders, <br />"tell me what needs to be done." Phare stated <br />that although the Public Works Department knows <br />generally of what needs to be done, i.e., a <br />specific tank situ, a specific point for <br />distribution, a submission of a proposal is <br />really only subject to a company's professional <br />interpretation of what needs to be done in order <br />to complete the project. <br />In trying to analyze why there was such a <br />difference in the two proposals, Phare stated that <br />RMC anticipated the need for construction inspec- <br />tion and identified and called for twice the <br />amount of manhour;s than did KKBNA. RMC's identi- <br />fied need for construction inspection has a cap - <br />not to exceed price - and could fall below that <br />which was bid. <br />Phare stated that in working with Homart, KKBNA is <br />certainly familiaz• with the area, but given the <br />work that RMC has done for the City, they clearly <br />have an "inside track as to the existing system, <br />5 <br />