Laserfiche WebLink
of payment. The applicant submitted a certified appraisal of the property which gave a market value <br />of $890,000 making the fee-in-lieu $106,800. One prominent issue with the Council and Planning <br />Commission had been the drive-thru at Boston Market. The applicant addressed this issue with a 42" <br />high retaining wall, berming and various landscape materials. The locations where the drive-thru <br />crosses pedestrian paths were proposed to be delineated with raised crosswalks that utilize enhanced <br />paving. The applicant proposed a 2' x 2' scored concrete for the sidewalks which would contrast with <br />the darker asphalt material. They proposed 210 parking spaces. Staff requested that an applicant <br />enter into a shared parking agreement between the two lots providing shared parking. Thirty <br />additional spaces were proposed in the revised phasing plan for Phase I. Brick and stucco were the <br />primary building materials with an asphalt shingle sloped roof system. Landscaping was 35% of the <br />site area, 20% actual landscaping and 15% into actual pedestrian amenity areas. <br /> <br />Davidson called for the applicant's presentation. <br /> <br />Rebecca Martin, Vintage Real Estate Services, representing owner Wol-shing Shiao and partners, <br />stated that Boston Market had agreed to a solid burgundy or Bordeaux color and the rest of the <br />center would have sand colored solid awning. Side areas had been highlighted with perennial <br />gardens. One of the pedestrian crossing areas that accessed from McCaslin Boulevard was moved <br />to the west and the back of the drive-thru. She pointed out that the landscaping complied with and <br />exceeded the landscape guidelines. The drive-thru would be nicely landscaped and concealed to <br />McCaslin Boulevard. The site exceeds parking requirements. The architecture and site design blend <br />well with Century Office Park, State Farm, and the bank building to the north. They asked that <br />Council not require the construction of two buildings at one time because either Boston Market <br />would have to coordinate with an entirely different developer in order to put up two buildings or the <br />developer of Boston Market would have to be able to lease and finance the other multi-tenant <br />building on his lot in order to start Boston Market. <br /> <br />Paul Trementozzi, OZ Architecture, 2236 Pearl Street, Boulder, Colorado, stated that the first three <br />conditions of the resolution had been agreed to. But, the fourth condition of simultaneous phasing <br />of two buildings would create much difficulty for the project. He wanted that condition removed. <br /> <br />Davidson called for Council comments. <br /> <br />Howard stated that his previous objections had been met and it looked like a nice, clean design. <br /> <br />Levihn wanted to see it all developed as soon as possible. He preferred the striped awning to solid. <br /> <br />Mayer asked where the cash-in-lieu money would go. <br /> <br />Bill Simmons, City Administrator, said it would go into the Conservation Trust Fund for land <br />acquisition. <br /> <br />Mayer, on the drive-thru and shrubs, wondered how it would provide screening in the winter. <br /> <br />4 <br /> <br /> <br />