Laserfiche WebLink
March 03, 1987 <br />To: Louisville Planning Commission <br />Attn: Dennis Ferrera, ChairpezSon <br />Dan DiSalle, Tim Griffin, Jeff Lipton, Mary Ann Pollock, <br />Tony Scipelt, Ed Young <br />cc: McStain Enterprises (c/o C. Hoyt) <br />Building Department, Louisville <br />Request: Please delay the issuance of a.building permit to <br />McStain Enterprises for the construction of Building #11 in <br />Westfield 2 until the placement of this building can be discussed <br />in the March 10, 1987, Planning Commission Public Hearing. <br />According the the P.U.D. filed for Westfield 2, Building #11 is <br />to be placed 10 feet further South of the location of the stakes <br />and excavation and Building #11 is to be placed 14 feet further <br />West than the stakes and excavation. The open space indicated on <br />the P.U.D. between Building #6 and #1lhas been reduced and the <br />views in Building #7 have been obstructed by this variance from <br />the P.U.D. <br />902, £L 1 3 _ 3- g_i <br />O t <br />Address <br />Address Date <br />59D e'zd & <br />A dress f% Date Q� <br />Addis 6140-e A D 3(3f U T <br />43 <br />Address Date <br />p OWL t iv , 3/3f 7 <br />Address Date / <br />4J-L4e/re <br />Da//7 <br />Address <br />Address <br />Date <br />•erf3 ? e 04 3 -3- 87 <br />Date <br />so C vz f7 e _ 3—.3 —87 <br />Address . Dabe <br />Ad <br />Address <br />