Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />October 8, 2020 <br />Page 6 of 10 <br />comfort of residential neighbors. He emphasized that he wanted to benefit everyone <br />around the property and noted that the kitchens created local jobs and involved lower <br />startup costs for people who wanted to be in the restaurant business. He noted that he <br />was not trying to run a night club and that people didn't generally want to eat with <br />blaring music. He finished by stating that he did have an agreement with the other <br />owners that he believed that everyone was satisfied with that those owners would not <br />objections to the project, though he could not speak on their behalf. <br />Co -applicant Kelly Siu, 7060 Harvest Road in Boulder, discussed the architecture and <br />the impact buffers for the outdoor areas, including the landscaping and the slanted <br />porch roof, and she described the interior of the food hall, as well. She noted that the <br />owners wanted greenery around the building. <br />Moline asked about the large, mature trees that were currently on the property. He also <br />asked if the existing building would be demolished. <br />Martinsons responded that they would have to demolish the current building and <br />observed that the architecture was not attractive. <br />Siu added that there was substantial structural damage to the building and that they had <br />done a feasibility study for salvaging some materials, but it was unsalvageable. She <br />replied that the existing trees would need to be removed as they were in the way of the <br />wider sidewalk. <br />Sharon Procopio, civil engineer for the project, 1319 Spruce Street in Boulder, added <br />that the trees were determined to not be in the best condition and were in the way of the <br />larger sidewalk. <br />Bill Gotthelf, landscape engineer for the project, 1466 North Franklin Court, added that <br />City forestry had asked that they remove the ash trees because they were susceptible <br />to disease. <br />Greg Topel, hospitality consultant for the project, 2112 Pine Street in Boulder, stated <br />that food halls can be incubators for chefs who otherwise would not have the <br />opportunity and that they can be a benefit to the area. He added that as landlords they <br />maintained the facilities and they outsourced the kitchens and provided business and <br />opportunity support to those kitchens. <br />Brant Clark, cider maker for the project, 3028 14th Street in Boulder, stated that he had <br />been making cider for 7-8 years and had partnered commercially with a local <br />winemaker. He described the process of cider -making and noted that they would be <br />using some cider available made from local apples but the production levels would <br />require more juice from the Western Slope. From the production side, odors and smells <br />would be contained in the building. <br />Diehl asked if the applicant would be supportive of codifying a 9 PM cutoff to music in <br />the application. <br />