Laserfiche WebLink
of vehicles or other related equipment needed in the provision of police services. Police <br />Capital Facilities include land acquisition costs for the site of the new police headquarters. <br /> <br />V. Site-Related Improvements. <br /> <br />Except for arterial roads and interchanges on the City's Road System, those transportation <br />improvements that provide direct access to the development. Direct access improvements <br />include but are not limited to the following: (a) driveways and streets leading to and from <br />the development; Co) fight and left turn lanes leading to those driveways and streets; (c) <br />traffic lights and other traffic control measures for those driveways; and (d) internal streets, <br />traffic lights and other traffic control measures. The foregoing street improvements include <br />all improvements within the right of way, including but not limited to all road preparation and <br />surfacing, curb and gutter, medians, entryways, underground utilities, sidewalks, bicycle paths, <br />bfidges, street lighting, landscaping and drainage improvements. Credit is not provided for <br />Site-Related Improvements under the terms of this Chapter. <br /> <br /> W. State. <br /> <br /> The state of Colorado. <br /> <br />X. Successor-in-Interest. <br /> <br /> A person, as defined by this Chapter, who is conveyed a fee simple interest in land for which <br /> an Impact Fee is paid or a credit is approved pursuant to the terms of this Chapter. <br /> <br />Y. Transportation Capital Facilities. <br /> <br /> The preliminary engineering, engineering design studies, land surveys, alignment studies, <br /> engineering, permitting and construction of all necessary features for any road on the City's <br /> Road System, undertaken to accommodate additional traffic (through the provision of <br /> additional capacity) resulting from new Impact-Generating Development in the City. <br /> Transportation Capital Facilities include but are not limited to: (a) construction of new <br /> through lanes; (b) construction of new bridges; (c) construction of new drainage facilities in <br /> conjunction with new road construction; (d) purchase and installation of traffic signals, <br /> including new and upgraded signalization; (e) construction of curbs, gutters, sidewalks, <br /> medians and shoulders in conjunction with new road construction; (f) relocating utilities to <br /> accommodate new road construction; (g) the construction and reconstruction of <br /> intersections; (la) the widening of existing roads; (i) bus turnouts; 0) acceleration and <br /> deceleration lanes; (k) interchanges; and 0) traffic control devices. Transportation Capital <br /> Facilities also include all fights-of-way necessary for the expansion or construction of a road <br /> on the City's Road System. For the purposes of this Chapter, Site-Related Improvements <br /> shall not constitute Transportation Capital Facilities. <br /> <br />Sec. 3.18.040 <br /> <br /> A. <br /> <br /> 1. <br /> <br />Development Impact Fees to be Imposed. <br /> <br />Fee Obligation, Payment and Deposit. <br /> <br />Obligation to Pay and Time of Payment. <br />After the effective date of this Chapter, any person who causes the Commencement <br />of Impact-Generating Development, except those exempted pursuant to Section <br />3.18.040.B, Exemptions, shall be obligated to pay Impact Fees pursuant to the <br />terms of this Chapter. The obligation to pay the Impact Fees shall run with the land. <br />The amount of the Impact Fees shall be determined in accordance with Section <br />3.18.040.C, Calculation of Jkrnount of Impact Fees and the Fee Schedule (Appendix <br />A) in effect at the time of issuance of a Building Permit, and paid to the City <br />Manager or designee at the time of issuance of a Building Permit. If any credits are <br /> <br />6 <br /> <br /> <br />