My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1992 10 20
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1990-1999 City Council Agendas and Packets
>
1992 City Council Agendas and Packets
>
City Council Agenda and Packet 1992 10 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:47:04 PM
Creation date
1/15/2010 2:19:07 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
10/20/1992
Supplemental fields
Test
CCAGPKT 1992 10 20
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
review. The start has reviewed that <br /> to as sure that we meet current <br /> drainaya requirements. As far as <br /> detention, this is an overall raster <br /> planned drainage facility. The <br /> detention that now exists within the <br /> City open space not only benefits <br /> the existing Hillsborough West <br /> development and the proposed <br /> Ridgev sw dsvelopasnt, but it also <br /> is • protection for the downstream <br /> drainage way. That's why this <br /> drainage pond is triple the size of <br /> what would be required. <br /> Hornbostsls I don't see how that going to serve <br /> lots 1 9. <br /> Jorgenaens In lots 1 - 9, vs will provide a <br /> *wale, which will go along Davidson <br /> Ditch. This water will eventually <br /> and up in the detention facilities. <br /> ;Most of that will be just yowr roar <br /> lot drainage, which is primarily <br /> insignificant and will be much lass <br /> than what you see right now. What's <br /> going to happen in the drainage <br /> facility is that you'll have a stars <br /> piping system, which is in the <br /> street systsa itself. This will <br /> follow all along West Willow Street <br /> and will access through the 30 ft. <br /> drainage easement underneath the <br /> ditch and into the existing <br /> detention pond. Currently, <br /> everything on the hillside runs oft <br /> into the ditch and eventually into <br /> the detention pond. What we will be <br /> doing by grading this area and <br /> providing the storm piping system is <br /> that only this area, lots 1 9, <br /> only the rear lots will be going <br /> that direction now. <br /> Hornbostel s I'm concerned about the access to <br /> South Boulder Road. The hill is so <br /> steep that it's very difficult to <br /> stop even in the best weather at the <br /> bottas of the hill. I have real <br /> concerns, about putting an access <br /> down there. You can't put a light <br /> down there from a practical <br /> 25 <br /> - ter f.� . - .. . • -• ' .. -•.w w... . •.. .Z�` <br />
The URL can be used to link to this page
Your browser does not support the video tag.