Laserfiche WebLink
Louisville Housing Authority January 21, 2004 <br />differences in the site work and the structures, we have neglected those differences for <br />simplicity. <br />Summary Spreadsheet <br />We have prepared a side by side summary spreadsheet of the per -unit costs for the 4 -unit and 6 -unit <br />projects. That summary sheet is attached for you reference. <br />Overall, not including the contingency fund, the per unit cost drops from $164,500 for the 4 -unit to <br />$139,400 for the 6 -unit. <br />We project that the 6 -unit project will have approximately $13,500 in additional site costs over the 4- <br />unit, due principally to the retaining walls necessary around the patios and the trash enclosure. This <br />additional site work cost for the 6 -unit amounts to about $2250 per unit, but the increase in the <br />number of units drops the overall site work per unit cost by a net $8125. The $16,975 remainder of <br />the per -unit cost reduction is due to the smaller units (1200 Sq. Ft.) necessary to get the 6 -unit project <br />on the site comfortably. <br />4. Cost Reductions <br />We have reviewed the costs associated with the site work as submitted to you on January 19, 2004. <br />There are two specific opportunities for budget cost savings <br />Contingency - This is a budget number that is used to cover unknown or unanticipated items at the <br />early stages of cost projecting, and a construction contingency for unforeseen conditions and <br />variations in bid prices. We would not like to see that number ever reached in actual <br />expenditures. It is not prudent however to enter into a project like this without this kind of fund <br />unless we have a great deal of detail and a contractor on board pricing hard numbers for the project. <br />The further the project goes into detail design the greater the certainty on the quantities and the <br />unknowns become fewer. At that point, the contingency budget can be reduced. The contingency <br />budget should be viewed as a worst -case scenario, and not as the budget target. <br />Drainage wall — The need for and the extent of the drainage wall along Ridgeview and South <br />Boulder Road will be reviewed in much more detail as the engineering. The cost for this wall was <br />included as a line item to cover a worst -case problem for the initial budgeting. I do not expect that <br />the entire wall will need to be constructed as shown, but we expect that some portion of that line <br />item will be needed for drainage resolution. Further engineering will define that need more <br />accurately. <br />5. Water and Sewer Tap Fees <br />Pending resolution <br />6. Field Utility Locates <br />Marked - Pending location <br />7. Comcast Cable <br />Pending resolution <br />We will be available to answer questions on call. Attached are two reduced size site plan sketches, a 4- <br />unit and a 6 -unit plan, and a cost spreadsheet comparing the two. <br />Page 2 <br />