My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2019-01
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2019 Resolutions
>
Resolution 2019-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2024 3:11:33 PM
Creation date
1/9/2019 9:33:51 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
IGA Lafayette_Quiet Zones Project Construction Services Cost Sharing 2019
Doc Type
Resolution
Ord/Res - Year
2019
Ord/Res - Number
01
City Property Name
Infrastructure Railroad
Project Name
Railroad Quiet Zones
Cross-Reference
Quiet Zone IGA Lafayette Louisville
BNSF
Original Hardcopy Storage
9C5
Quality Check
1/9/2019
Record Series Code
45.160
Record Series Name
Resolutions
Supplemental fields
Budget Number/Name
Railroad Quiet Zones
Test
RES 2019-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 1 <br />SERIES 2019 <br />A RESOLUTION APPROVING AN INTERGOVERNMENTAL AGREEMENT FOR <br />SHARING OF COSTS OF QUIET ZONE PROJECT CONSTRUCTION SERVICES <br />BETWEEN THE CITY OF LOUISVILLE AND THE CITY OF LAFAYETTE <br />WHEREAS, the cities of Louisville and Lafayette (the "Parties") desire to establish a quiet <br />zone area along the BNSF rail line from Baseline Road in Lafayette to Pine Street in Louisville, which <br />will include improvements at four highway rail crossings, three of which are in Louisville and one of <br />which is at Baseline Road in Lafayette (the "Project"), and <br />WHEREAS, the Project consists of two phases: (1) a "Design Phase," which consists of <br />engineering, design and permitting for the four quiet zone locations and which was completed in <br />2018, and (2) a "Construction Phase," which will consist of the construction of the quiet zone <br />improvements and which is intended to be completed in 2019; and <br />WHEREAS, Louisville has applied for and received or will receive a federal Surface <br />Transportation Improvement Program grant of an estimated amount of $1,556,138 (the "Grant") to <br />complete the Design and Construction Phases of the Project and has or will enter into a grant <br />agreement with the Colorado Department of Transportation ("CDOT") for the Project; and <br />WHEREAS, the Grant requires a local match of an estimated amount of $323,483 in <br />matching funds as a condition of receiving the Grant; and <br />WHEREAS, on February 21, 2017, the Parties entered into an IGA confirming their intent <br />to undertake the Project addressing the sharing of costs for the Design Phase of the Project, and <br />acknowledging the Parties' intent to enter into a future agreement to address the Construction Phase <br />of the Project; and <br />WHEREAS, C.R.S. § 29-1-201, et seq., authorizes and encourages local governments to <br />make the most efficient and effective use of their powers and responsibilities by cooperating and <br />contracting with one another to provide any function, service, or facility lawfully authorized to each, <br />including contracting for the sharing of costs; and <br />WHEREAS, there has been proposed an Intergovernmental Agreement for Sharing of Costs <br />of Quiet Zone Project Construction Services ("Agreement") to identify the allocation of the cost of <br />local matching funds for the Construction Phase of the Project, and to establish the process by which <br />such allocation and payment of matching funds will be accomplished, and <br />WHEREAS, per the Agreement, Louisville will oversee the completion of the Construction <br />Phase of the Project, will be the lead agency with respect to contracting and communicating with <br />CDOT, and will be solely responsible for all contracting, supervisory and administrative matters <br />Resolution No. 1, Series 2019 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.