Laserfiche WebLink
<br /> - <br /> ETKIN [}Jflj@fA&T? <br /> JOHNSON <br /> "~r'_._'.=- <br /> Page Three of Eight <br /> December 4, 2006 <br /> lines to be maintained privately. <br /> Response: Landscape planting has been modified as required to acknowledge <br /> existing utility easements. <br /> 9. On page 2 of 13, what does keynote 20 and 21 represent? There are not <br /> descriptions of those keynotes listed in the legend. <br /> Response: Keynote 20 has been identified <br /> Keynote 21 has been identified <br /> 10. The IDDSG discourages long interrupted wall planes in the public zone. <br /> Proposed building elevations for the north elevations reflect such a condition <br /> and do not reflect the necessary architectural articulation. Please revise the <br /> PUD architectural plan to reflect the additional architectural accent in the <br /> form of a wall recess or inset for the north building elevations. It is <br /> recommended that additional architectural elements, such as canopies or <br /> varied material patterns, be used where building reveals and setbacks are not <br /> possible. <br /> Response: The north building elevation has been revised to provide <br /> additional "3 '0" steps" at two locations. Entrance canopies have been <br /> detailed at three locations at the north building elevations. <br /> 11. Additional architectural detail is required for all main building entries. This <br /> may be accomplished through increasing the height of glazing at each <br /> entrance, or by the addition of a metal canopy at each of the four primary <br /> building entries shown on the site plan. Staff would request the addition of <br /> bollard lighting at each of the main building entries. <br /> Response: Entrance canopies are provided at the primary tenant entries. In <br /> lieu of bollards, undercanopy lights will be provided at main tenant entrances. <br /> 12. Please provide additional detail on the architectural plan to reflect the use and <br /> application of color to the building. How will color be utilized to reflect <br /> accent from the base color? Are the reveals to be painted? <br /> Response: A building rendering will be provided <br /> 13. There needs to be more color variation between the proposed colors. White, <br /> tan and beige are too close in color to provide the necessary articulation. <br /> Response: Proposed colors have been corrected on the drawings to <br /> correspond with the 8 !1" x 1 J " proposed buildingfinishes. Sherwin <br /> Williams has revised the color names and numbers and the new names <br />