My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2012 01 12 (export PDF save as TIF)
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2012 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2012 01 12 (export PDF save as TIF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:49:46 AM
Creation date
5/4/2012 10:09:20 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2012 01 12 (export PDF save as TIF)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Staff Report <br />January 12, 2012 <br />this location. City design standards do not address roundabouts: however, City staff is <br />familiar with national best practices and are familiar their design requirements. <br />In concept staff supports the design of the roundabout, or similar solutions, along with a <br />possibility of narrow street cross sections within residential areas for traffic calming <br />purposes. Staff is willing to consider accepting nonstandard altemative designs to those <br />proposed for Steel Street and Luke Street as public ROWs in the Final Plat and PUD <br />submittal after further design specifics are vetted with the applicant and the Public Works <br />Department. <br />The proposed apartment complex in Planning Area 48 has a separate roadway <br />circulation, providing Fire Safety approved aisle width (20' minimum) and parking <br />alongside the aisles. The interior circulation for the apartment complex has an <br />ingress/egress onto Heda Drive. <br />Public Land Dedication <br />The proposed preliminary Plat and PUD includes portions of previously platted areas <br />(Lot 1. Block 10 of the Takoda Subdivision: and Lot 3A of the Davidson Highline <br />Subdivision, replat) and 5.93 acres of previously unplatted area (previously known as <br />Tebo / Dellacava Parcel). <br />Lot 3A <br />Tebo I Dellacava Parcel <br />Regional Trail <br />Lot 1. Block 10 <br />Lot 3A and Lot 1, Block 10 have had public land dedicated by previous plats, therefore <br />the only area subject to public land dedication is the 5.93 acres of the Tebo/Dellacava <br />Parcel. The required public land dedication is .65 acres (15% of the net acreage). <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.