Laserfiche WebLink
Planning Commission <br />Staff Report <br />January 12, 2012 <br />Maximum Lot Coverage:85% <br />Minimum Front Yard Setback (Principal Uses):6’ (all conditions) <br />Minimum Side Yard Setback (Principal Uses):5’ (all conditions) <br />Minimum Rear Yard Setback (Principal Uses):4’ (to alley) <br />Setback from collector street ROW:parking: 15’; <br />building: 10’ <br />Setback from local street ROW:parking: 5’; <br />building: 5’ <br />Minimum building separation:10’ <br />Maximum Building height:55’ (principal); 35’ (accessory) <br />The multi-family units consist of 10 multiplex apartment buildings clustered around a <br />common open space. The open space area will provide pedestrian connections leading <br />to the adjacent trails and a clubhouse/pool. <br />Height <br />The preliminary PUD proposes the buildings be built to heights previously approved by <br />the GDP:Single-family structures will be permitted up to 35’ in height and all Multi-family <br />structures will be permitted up to 55’ in height. When staff reviews a height request we <br />use an exercise known as a “shadow analysis”.This isa modeling exercise to show <br />where potential shadows will be casted at all times of the yearandis used to show if <br />there are any detrimental effects of the proposed buildings on existing structures. In the <br />case of Steel Ranch South, all proposed new development is north of the nearest <br />development, Christopher Village. Therefore shadows will not be a detriment on the <br />surrounding structures and “shadow casting” is not required. <br />Parking <br />Typical site layouts of Planning Area 4A reflectthat each unit will meet the required off- <br />street parking requirement of two spaces per unit.On street parking is also being <br />provided for quests.Each unit being proposed is an alley loaded model, therefore there <br />will be nofront garage loaded units. <br />Phasing Plan <br />Aprovided phasing plan in the PUD reflects Planning Area 4B, the multi-family <br />development, will be built first, with the intent to start construction in early summer. <br />Transportation <br />The primary access for this development is from Hecla Drive and ultimately Hwy 42. <br />Secondary access is proposed from South Boulder Road. South Boulder Road access <br />would primarily be for right-in only and emergency egress for the following reasons: <br />a.Property frontage along South Boulder Road-Due to the limited width of <br />the property frontage along South Boulder Road (approximately 200 feet) <br />there isn’t enough separation between the existing access at Christopher <br />Village and the BNSF Right of Way for a new access. <br />b.BNSF & South Boulder Road median-The existence of the median along <br />South Boulder Road prohibits anything but a right-out movement. The <br />10 <br />