My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012 1 SPRING
PORTAL
>
COMMUNITY UPDATE NEWSLETTER
>
2012 Community Update Newsletter
>
2012 1 SPRING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:47:29 AM
Creation date
9/13/2012 10:08:14 AM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Newsletter
Record Series Code
40.260
Record Series Name
Publications
Quality Check
1/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2012 STREET, SIDEWALK, AND UTILITY PROJECTS • <br />G, <br />he warm weather brings with it the summer construction season. This year the Public <br />1 Works Department will be completing multiple projects on utilities, streets, and side - <br />8 .. <br />walks. Those property owners directly affected by the projects will receive a detailed notice <br />from Public Works. Additional information is available on the City's web site at www.Lou- <br />isvilleCO.gov. Look for the link on the right hand column titled "Construction Updates." <br />The web site includes work schedules and project maps, and will include updated informa- <br />tion if there are project delays or weather disruptions. <br />We appreciate your patience as streets and sidewalks are disrupted. Should you have any questions, please contact the <br />Public Works Department at 303.335.4608 or PWorks@LouisvilleCO.gov. <br />bcsiai <br />2012 UTILITY PROJECT <br />We are about half way through this project that encom- <br />passes the south end of Old Town. The project includes <br />the replacement of approximately 3000 lineal feet of <br />water and sewer lines. Construction should be complete <br />in mid June. <br />2012 PAVEMENT CRACK SEAL PROJECT <br />Our contractor is currently working in various locations <br />City wide to seal moderate to severe pavement cracks <br />that have been identified as needing repair. Work should <br />be complete by the end of May. <br />HIGHWAY 42 WALKWAY AND <br />RETAINING WALL PROJECT <br />The project will complete the missing sidewalk segment <br />along the west side of State Highway 42 between Harper <br />Street and South Boulder Road. Construction began in <br />mid April and should be complete by late May. <br />BE WATER WISE <br />A nyone who has lived here for more <br />than a few years can tell you that <br />this past winter was a dry one!! In fact, <br />March, normally our wettest month, was <br />the driest on record. Snow pack is down <br />and warm weather has been abundant. <br />As such, we are preparing for a below <br />average year for water availability. The City has not <br />implemented any portions of the Drought Management <br />Plan (available at www.LouisvilleCO.gov), but if warm, <br />dry weather continues into the summer that is possible. <br />In the meantime, the City is asking you to conserve <br />as much water as possible. Please be water wise!! <br />2012 CONCRETE REPLACEMENT PROJECT <br />Each year City staff examines sidewalk segments for <br />safety hazards, severe settlement, cracking and deficien- <br />cies and then identifies those needing replacement. Our <br />contractor will be replacing concrete in various locations <br />City wide from mid May to early July. <br />2012 STREET CONSTRUCTION <br />Staff annually evaluates streets for wear and tear and <br />identifies those areas that need help or maintenance to <br />preserve and extend the life cycle of the asphalt pave- <br />ment. In severe cases we will replace an entire pavement <br />section. Street construction will commence in various <br />locations in late June and is expected to be complete by <br />mid August. <br />NEW RIGHT -OF -WAY <br />PERMIT FEES <br />The City recently adopted new fees and proce- <br />dures for right -of -way permitting. As of April <br />3, 2012 a base fee of $50 is being charged for all right - <br />of -way permits. A list of the new fees and the permit <br />application are available at www.LouisvilleCO.gov under <br />the Public Works, Engineering section. <br />Right -of -way permits are required for any work in the <br />City's rights -of -way, or for the placing of storage con- <br />tainers, trailers, dumpsters, or materials in the right -of- <br />way. <br />If you have any questions, please contact the Public <br />Works Department at PWorks@LouisvilleCO.gov or <br />303.335.4608. <br />May 2012 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.