Laserfiche WebLink
APPROVED <br />September 14, 2004 <br />Pritchard moved and Loo seconded a motion to approve the detailed set of minutes for the July <br />13, 2004 and July 22, 2004 meetings. Motion passed unanimously with a voice vote. <br /> <br /> <br />8.The following items are tentatively scheduled Tuesday, September 14, 2004. <br /> <br /> <br />Spruce Street Apartments <br /> (aka Hu Subdivision), a final subdivision plat for the <br />Spruce Street Apartments Subdivision (aka Hu Subdivision), a proposed 3 lot, multi- <br />family residential subdivision located on the south side of Spruce St. between <br />Highway 42 and the BNSF Railroad. Case #04-018-FS/FP. <br /> <br /> <br />Case Manager: Kenneth Johnstone, Principal Planner <br /> <br /> <br />Applicant and Owner: Paul Hu <br /> <br /> <br /> <br />Representative: Lee Stadele, Flagstaff Surveying, Inc. <br /> <br /> <br />City of Louisville, Public Library <br />, a preliminary planned unit development (PUD) <br />and preliminary consideration of a special review use (SRU) to build a new 32,000 <br />SF Library on two levels with a below grade parking structure at 800 Front St. at the <br />northwest corner of the intersection of Spruce and Front Streets, Lots 2 – 6, Block 2, <br />Town of Louisville. Case #04-019-PP. <br /> <br />Case Manager: Paul Wood, Planning Director <br /> <br />Applicant and Owner: City of Louisville, represented by Julie Boyd, Deputy City Manager <br /> <br />Representative: Humphries Poli Architects <br /> <br /> <br />The Levihn Addition Subdivision <br />, a minor subdivision replat of Lots 7 and 8 and <br />the north half of Lot 9, less the easterly 50 feet thereof, Block 8, Caledonia Place into <br />two lots of approximately 6,250 SF each, 1440 Front Street. Case #04-020-FS. <br /> <br /> <br />Case Manager: Kenneth Johnstone, Principal Planner <br /> <br /> <br />Applicant and Representative: Main St. Property Holdings II, Herb Newbold <br /> <br /> <br /> <br />Owner: Arnold Levihn <br /> <br />Johnstone reported that all cases are on track for the September 14 meeting. <br /> <br />Pritchard: <br /> Is the library coming forward with a height variance request? <br />Wood: <br /> The preliminary does not include the architectural elements but staff has also heard that a <br />request might be coming forward. <br /> <br /> <br />9.Staff Comments <br /> <br /> <br /> <br />Citywide Comprehensive Plan Update <br />Wood reviewed the June 30, 2004 Public Meeting Summary sheet that was included the <br />Commission meeting packets with the following discussion points: <br />Key issues <br /> <br /> <br />Planning Principals <br /> <br /> <br />Evaluation of the eight Opportunity Areas. <br /> <br /> <br />How the attendees used the green and red dots that they were provided. <br /> <br /> <br />Next public workshop is scheduled for Thursday, September 16 at the Arts Center. <br /> <br /> <br />August 24, the regularly scheduled study session for the Planning Commission will be <br /> <br /> <br />used as a formal long range planning session. Results of the survey will be included at <br />that meeting as well as a review of agenda for the September 16 workshop. <br /> 4 <br /> <br />