My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2015 01 12
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2015 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2015 01 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:06 PM
Creation date
1/13/2015 2:35:02 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2015 01 12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LCityof <br />Louisville <br />Golf Course Advisorj' Board Minutes <br />November 17 2014 <br />Page 3 of 6 <br />COLORADO - SINCE 1878 <br />• Repairing the parking lot where the retaining wall was undermined has still to be <br />done. Little additional damage has been caused due to the staging of material and <br />equipment in the parking lot <br />• Drainage work has still to be completed on holes #3 and #4 and the turf has to be <br />repaired when the pipe- laying work is complete. <br />• Guard rails for the new bridges are in the design phase, these will need to meet <br />current safety standards for height etc.. <br />• Throughout the winter, targeted "dormant seeding" will be done in problem areas to <br />expedite growth. In addition, LU expects that in spring, "wall -to- wall" slit- seeding <br />will be done. <br />• With the majority of tasks complete, LU is starting to move equipment off site. The <br />surplus irrigation material will be kept in inventory for any repairs that may be <br />needed in the future. <br />• The batch of irrigation solenoids manufactured in April 2014 has a significant <br />defect and all are being replaced at the expense of the manufacturer, Rainbird. <br />Only the solenoids on the driving range are from a good batch so the remaining <br />1700 solenoids are being replaced out of a total of over 1900. <br />• Staff is presenting to City Council an approval request for LU to complete the <br />nurture of the course during the grow -in period. Since approvals are granted on a <br />fiscal year basis, the 2015 work requires separate approval. The total cost of the <br />grow -in work is $634. <br />• David Dean is working with LU to devise a strategy to phase over to City <br />employees when the grow -in contract is complete. LU employees who have <br />worked on this phase of the project are eligible to be considered for employment <br />as part of the City maintenance team. <br />• LU is continuing to work on the small number of major items still outstanding, <br />subject to weather conditions. In early spring, a punch list — probably of 70 — 100 <br />items - will be created to achieve satisfactory full completion of the contract. <br />• The board noted that planting the trees on the berm between hole #16 and HWY <br />36 will be delayed until spring. The planting window has been missed for this year <br />and spring will give a better selection of trees and provide more favorable planting <br />conditions. <br />8. Discussion on Grow -in Project <br />The point at which the course will be ready for play is totally dependent on the <br />winter /spring weather. LU is confident that we will be able to open by the end of <br />spring (June 21) and that date can be confirmed or modified depending on how well <br />the grass is growing in by March / April next year. <br />PARKS AND RECREATION DEPARTMENT - 749 MAIN STREET • LOUISVILLE, CO 80027 <br />(303) 3354735 - FAX (303) 3354738 <br />www.Iou isvi I leco.gov <br />PARKS RECREATION SENIOR SERVICES0 OPEN SPACE FORESTRY TRAILS GOLF <br />
The URL can be used to link to this page
Your browser does not support the video tag.