My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Agenda and Packet 2015 01 23
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2010-2019 City Council Study Sessions
>
2015 City Council Study Sessions
>
City Council Study Session Agenda and Packet 2015 01 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:53:51 AM
Creation date
1/23/2015 2:27:22 PM
Metadata
Fields
Template:
CITYWIDE
Original Hardcopy Storage
6C6
Supplemental fields
Test
SSAGPKT 2015 01 23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Show annotations
View images
View plain text
12/21/2014 <br />Page 3 <br />Rearranging the plan so that only 2 maintenance bays remained drive through, and more <br />efficiently utilizing space around the non -drive through bays for equipment storage. <br />Reducing the size of the wash bay. This actually ended up becoming bigger because of the <br />City's desire to multipurpose this space to store pre - loaded snow plows at the onset of <br />incoming snow storms. <br />May 2013 — Completion of Schematic Design <br />Schematic Design Cost Estimate (existing PW Site): $9,025,257 <br />Cost Difference (to RFP): +50% <br />Costs after Value Engineering (existing PW Site): $8,375,363 <br />Cost Difference (to RFP): +40% <br />Also during this time, our team prepared and submitted the PUD submittal on the existing Public Works <br />Site. After submission, the City's internal conversation changed and the CTC site was identified as a new <br />potential location for this project. RNL assisted the City by creating test fits on two different sites at CTC, <br />and the City selected and purchased a third site. RNL was then authorized to update our schematic design <br />set for the current site at Dillon Road and 5. 104th Street. At this time, RNL and the City agreed to a change <br />order for $126,625 to update the schematic design and PUD for the final CTC site. Authorization occurred in <br />October 2013 and an updated design presentation was made to the City in mid - December, 2013. To help <br />cover the increased design costs the Post Construction services were removed from our scope entirely, <br />which eliminated $9,150 of fee + expenses. This Change Order brought the new contract total to $825,000. <br />RNL's Final Program — CTC Site: <br />Existing Public Works Site: <br />Public Works Operations (Shops): <br />Public Works Heated Vehicle Storage: <br />Parks Ops (Shops): <br />Parks Ops (Heated Storage): <br />Fleet Maintenance: <br />Administration and Meeting Rooms: <br />Shared Areas: <br />Total (Conditioned Space): <br />13.30 acres <br />2,734 sf <br />12,067 sf <br />1,969 sf <br />8,133 sf <br />6,619 sf <br />8,069 sf <br />7,752 sf <br />47,343 sf <br />Square Footage Difference (to RFP): +52% <br />Bryan Construction's construction cost for the new Schematic Design was $10 million. The additional costs <br />were a result in the change in site work (grading, pavement and new utilities) and the additional square <br />footage (13,908) required by the CTC's design guidelines for enclosing all seasonal fleet vehicles and <br />equipment. City Council approved this budget and authorized completion of the project. <br />In January 2014, the Plenary Group approached the City about a potential co- habitation of the site to <br />maintain their US -36 maintenance fleet. This conversation and resulting studies continued for several <br />months, until ultimately the Plenary Group pulled out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).