My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Adjustment Agenda and Packet 2015 11 18
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BOARD OF ADJUSTMENT
>
2001-2019 Board of Adjustment Agendas and Packets
>
2015 Board of Adjustment Agendas and Packets
>
Board of Adjustment Agenda and Packet 2015 11 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:03:12 PM
Creation date
12/7/2015 10:22:09 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
BOAPKT 2015 11 18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Adjustment <br />Meeting Minutes <br />August 19, 2015 <br />Page 4 of 6 <br />➢ Downtown /Miners Field — Floodplain Development Permit Request — A <br />request for approval of a floodplain development permit to conduct drainage <br />improvements in the Downtown and Miners Field areas. Case #15- 027 -FL <br />i. Applicant and Owner: City of Louisville <br />ii. Representative: Cameron Fowlkes, PE, City of Louisville <br />iii. Case Manager: Scott Robinson, Planner 11 <br />Meseck reviewed the procedures for the meeting; opened the public hearing; and stated <br />there are six criteria which must be met for the board to approve a variance request. <br />Meseck then stated copies of the criteria are located on the table next to entryway. He <br />asked for verification of proper public notice. <br />Robinson verified the application to be heard this evening is complete, and was mailed <br />to surrounding property owners on July 24, 2015, published in the Boulder Daily <br />Camera on July 26, 2015, and the property was posted on posted on July 24, 2015. <br />Malmquist moved and Ewy seconded a motion that all requirements have been satisfied <br />and the application submitted by the applicants has been properly filed. Motion passed <br />by unanimous voice vote. <br />Meseck asked if anyone at the hearing had any objections to the hearing procedures he <br />had described and asked if there were any other preliminary matters that needed to be <br />taken care of. None were heard. <br />Meseck asked for disclosures from the board members for any site visits, ex parte <br />communications, and any conflicts of interest or required disclosures on the application. <br />All Board members indicated they did not have any ex parte communications or any <br />conflicts of interest for the application. <br />Meseck stated that for the requested variance to be approved, four (4) of the four (4) <br />votes would need to be affirmative. <br />Meseck asked the applicants if they were ready to proceed with the hearing. <br />The applicants indicated they were ready to proceed with the hearing. <br />Staff Presentation of Facts and Issues: <br />Robinson summarized the request for a floodplain development request for the drainage <br />improvements for Downtown, but involves Miners Filed area: <br />▪ Background: <br />a. The utility improvements are located within 100 year floodplain <br />b. Utility improvements will remove large portions of Downtown out of <br />the flood plain <br />c. Utility uses are allowed as long as there is no adverse impact on <br />the floodplain <br />d. A certified engineer, Cameron Fowlkes, has stated there are no <br />adverse impacts from the proposed development. <br />▪ All criteria have been met. <br />▪ Therefore Staff recommends approval of this request <br />Questions from Board to Staff. <br />Fuller asked if there was a proposed time frame. <br />
The URL can be used to link to this page
Your browser does not support the video tag.