My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Agenda and Packet 2008 06 24
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2001-2009 City Council Study Sessions
>
2008 City Council Study Sessions
>
City Council Study Session Agenda and Packet 2008 06 24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:35:41 AM
Creation date
9/8/2008 1:10:41 PM
Metadata
Fields
Template:
CITYWIDE
Original Hardcopy Storage
5F6
Supplemental fields
Test
SSAGPKT 2008 06 24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUBJECT: DISCUSSION -BUILDING CODE BOARD OF APPEALS -GREEN <br />BUILDING <br />DATE: JUNE 24, 2008 <br />b. Site Development <br />c. Building Rehabilitation <br />d. Waste Management <br />e. Energy Efficiency <br />1. Insulation <br />2. Windows <br />3. Air Sealing of an Existing Building <br />4. Heating, Ventilation and Air Conditioning Systems <br />5. Water HE~ater <br />6. Lighting, Appliances, and Electricity <br />f. Solar <br />g. Water Efficiency <br />h. Material Efficient Framing and Structures <br />i. Sustainable Products <br />j. Indoor Air Quality <br />k. Homeowner Information <br />I. Not used <br />m. Design Process and Innovation <br />Administration: Third Party Certified HERS Raters provide modeling, inspections and energy <br />audit. The City of Boulder Staff consists of 6 FTE in the Environmental Affairs Division and <br />also requires Building Department staff to help administer the points program, accept <br />applications, inspect and ensure compliance. This program started as a voluntary program <br />and has evolved from a points only system to this recent version of a points plus the <br />mandated items including the HERS rating. <br />Cost to C/ient Fee to City as well as to thiird party inspector for HERS Rating $2,000 to <br />$5,000 <br />Construction cost to Project: YTD very new <br />Citv of Longmont <br />The City of Longmont Green Points Program <br />Type: This is a points only program. This is a reduced points version of the City of Boulder's <br />original points program. <br />Points only Program Schedule: <br />Project Description Thresholds <br />New Construction up to 2,000 sq. ft. <br />New Construction 2,000 to 3,50() sq. ft. <br />New Construction 3,501 and larger <br />Interior Remodel 300 to 1,000 sq. ft. <br />Points Required <br />30 points <br />40 points <br />40 points plus 1 point for <br />Each additional 50 sq. ft. <br />6 points <br />
The URL can be used to link to this page
Your browser does not support the video tag.