My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 1992 10 06
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
1970-1999 City Council Minutes
>
1992 City Council Minutes
>
City Council Minutes 1992 10 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:31:35 PM
Creation date
8/3/2005 8:45:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
10/6/1992
Original Hardcopy Storage
2E3
Supplemental fields
Test
CCMIN 1992 10 06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hornbostel: <br /> <br />review. The staff has reviewed that <br />to make sure that we meet current <br />drainage requirements. As far as <br />detention, this is an overall master <br />planned drainage facility. The <br />detention that now exists within the <br />City open space not only benefits <br />the existing Hillsborough West <br />development and the proposed <br />Ridgeview development, but it also <br />is a protection for the downstream <br />drainage way. That's why this <br />drainage pond is triple the size of <br />what would be required. <br /> <br />I don't see how that going to serve <br />lots 1 - 9. <br /> <br />Jorgensen: <br /> <br />In lots 1 - 9, we will provide a <br />swale, which will go along Davidson <br />Ditch. This water will eventually <br />end up in the detention facilities. <br />Most of that will be just your rear <br />lot drainage, which is primarily <br />insignificant and will be much less <br />than what you see right now. What's <br />going to happen in the drainage <br />facility is that you'll have a storm <br />piping system, which is in the <br />street system itself. This will <br />follow all along West Willow Street <br />and will access through the 30 ft. <br />drainage easement underneath the <br />ditch and into the existing <br />detention pond. Currently, <br />everything on the hillside runs off <br />into the ditch and eventually into <br />the detention pond. What we will be <br />doing by grading this area and <br />providing the storm piping system is <br />that only this area, lots 1 - 9, <br />only the rear lots will be going <br />that direction now. <br /> <br />Hornbostel: <br /> <br />I'm concerned about the access to <br />South Boulder Road. The hill is so <br />steep that it's very difficult to <br />stop even in the best weather at the <br />bottom of the hill. I have real <br />concerns about putting an access <br />down there. You can't put a light <br />down there from a practical <br /> <br />25 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.