Laserfiche WebLink
Hornbostel: <br /> <br />review. The staff has reviewed that <br />to make sure that we meet current <br />drainage requirements. As far as <br />detention, this is an overall master <br />planned drainage facility. The <br />detention that now exists within the <br />City open space not only benefits <br />the existing Hillsborough West <br />development and the proposed <br />Ridgeview development, but it also <br />is a protection for the downstream <br />drainage way. That's why this <br />drainage pond is triple the size of <br />what would be required. <br /> <br />I don't see how that going to serve <br />lots 1 - 9. <br /> <br />Jorgensen: <br /> <br />In lots 1 - 9, we will provide a <br />swale, which will go along Davidson <br />Ditch. This water will eventually <br />end up in the detention facilities. <br />Most of that will be just your rear <br />lot drainage, which is primarily <br />insignificant and will be much less <br />than what you see right now. What's <br />going to happen in the drainage <br />facility is that you'll have a storm <br />piping system, which is in the <br />street system itself. This will <br />follow all along West Willow Street <br />and will access through the 30 ft. <br />drainage easement underneath the <br />ditch and into the existing <br />detention pond. Currently, <br />everything on the hillside runs off <br />into the ditch and eventually into <br />the detention pond. What we will be <br />doing by grading this area and <br />providing the storm piping system is <br />that only this area, lots 1 - 9, <br />only the rear lots will be going <br />that direction now. <br /> <br />Hornbostel: <br /> <br />I'm concerned about the access to <br />South Boulder Road. The hill is so <br />steep that it's very difficult to <br />stop even in the best weather at the <br />bottom of the hill. I have real <br />concerns about putting an access <br />down there. You can't put a light <br />down there from a practical <br /> <br />25 <br /> <br /> <br />