Laserfiche WebLink
cc <br />W <br />0 <br />z <br />cc <br />Q <br />O <br />cc <br />W <br />co <br />Z <br />0 <br />Q <br />cc <br />cc <br />coZ <br />z <br />Q <br />O <br />a <br />o <br />w <br />z <br />Z N <br />I1) <br />(1 W 10 <br />z <br />z <br />• Q>- <br />cn c13 <br />occ <br />ow <br />cc <br />O ww <br />Q ¢ <br />3- <br />0 <br />LL <br />• NEW HOPE, MINNESOTA <br />0 <br />00 <br />CC <br />a <br />0 <br />U_ <br />CD <br />REORDER BY PART NUMBER 6552 <br />0 <br />w <br />z <br />Z <br />o w <br />= m <br />w, Z <br />z� <br />cn m <br />I— <br />w <br />CI <br />❑ o <br />CC <br />3- <br />8 <br />co <br />• <br />REORDER BY PART NUMBER 6552 <br />4 <br />• <br />PHASE2 <br />CAVE. <br />STR <br />3332 law <br />W <br />12 I CALEDONIA PLACE J <br />� N <br />, <br />BLOCK 8 <br />GRIFFITH-STREET <br />(EX. 60' ROW) <br />CALEDONIA PLACE k O C <br />J <br />LBLOCK 7 Q <br />rr <br />LOT 101 <br />\\‘ <br />Final Planned Unit Development Phases 1 and lA <br />A part of section 8, township 1 south, range 69 west of the 6th p.m. <br />City of Louisville, County of Boulder, State of Colorado <br />LOT 102 <br />If.OUISVILLE TRAD <br />CENTER <br />LOT <br />BLOCK <br />A <br />LOT .3 <br />BLOCK A <br />INDUSTRIAL AREA <br />SUBDIVIISION <br />LOT 4 <br />BLOCK A <br />8)„A�am�nl,____,.".,'.,eau._._-.Mw�(..w <br />—7^ EX, 6('" STORM -SEER <br />LEGEND <br />PHASE 1 <br />1 <br />LOT 6 <br />BLOCK A <br />PHASE 1A <br />PHASE 2 <br />LOT 7 <br />BLOC< A <br />COAL CREEK <br />I <br />4 <br />SHc T <br />STREET <br />Cts <br />SOUTH STREET <br />PEDESTRIAN <br />GATEWAY AND <br />PLAZA (BY CITY <br />OF LOUISV <br />U. <br />00 <br />.., �w. <br />STEPHEN D. TEBO <br />PROPERTY <br />FUTURE SALIZED <br />INTERSECTION (BY <br />CITY O -T MLLE) <br />r-- . } 1 <br />1 <br />EAST LOUISVILLE <br />BLOCK 1 <br />1 <br />��SOUTi� STREET �_ <br />(Ex. HSN-M!ARIES) - • <br />myMINER'S PARK <br />BASEBALL FIELDS <br />• <br />\ <br />\ <br />:.. —\....,� \ <br />• <br />\\• \\\\\\\\\‘%4•�� \\\\4\44\�:••, .,•,..,.\\�;���. <br />::V�Pt:. ,.\\..��. ••\ 4 \\\\�\\\\ ♦ y...\.\i,,, •..,, \„4.:.,.,\\ <br />..::....:.:::::. <br />• <br />• <br />• <br />4 \. <br />CiSYuii]'SS1 :i <br />PHASING PLAN NOTES: <br />\\ <br />• <br />:; ,.,.,, <br />\�\�::•, <br />\'‘\\\‘‘‘.".."•• •,\4:: ;\:��::`':' \\\\\� t�4����� \ �"`,`\\\\4\\ C\Q\\\\\\\x\4\44\\��c\\\\\ r:.:.. <br />\\\`\\4\��•\,\\\\\` \ \444\\4\\\\� \ • � 4; �:,,,,•\•p\ .••• \. <br />4:.vv, <br />• <br />PHASE 1 IMPROVEMENTS SHALL INCLUDE AND ARE LIMITED TO THE FOLLOWING: <br />• CANNON STREET FLATWORK, PAVING, WET AND DRY UTILITIES AND WEST /2 <br />LANDSCAPE IMPROVEMENT BETWEEN GRIFFITH STREET AND JOHNSON LANE. <br />• NORTH FRONT STREET FLATWORK, PAVING, WET AND DRY UTILITIES AND <br />LANDSCAPE IMPROVEMENT BETWEEN GRIFFITH STREET AND JOHNSON LANE. <br />• MARIA LANE <br />• JOHNSON LANE <br />• SANITARY SEWER AND ASSOCIATED PRIVATE SERVICES WITHIN TRACT C AND <br />TRACT E AND WITHIN CANNON STREET TO THE CONNECTION AT E. LAFAYETTE <br />STREET. <br />• <br />• TRACT A HARDSCAPE AND LANDSCAPE IMPROVEMENTS. <br />♦ • TRACT C MEWS HARDSCAPE AND LANDSCAPE IMPROVEMENTS <br />• THE LOOPED WATER MAIN AND ASSOCIATED PRIVATE SERVICES <br />1 ♦ 1 • PRIVATE STORM SEWER WITHIN TRACT C, TRACT E, AND CANNON STREET TO THE <br />• I OUTFALL IN TRACT H. <br />• THE PRIVATE TEMPORARY DETENTION AND WATER QUALITY POND LOCATED <br />/ WITHIN TRACT H AND THE ASSOCIATED OUTFALL STRUCTURE AND TIE TO THE <br />EXISTING 60” RCP. TEMPORARY DRAINAGE SWALES FROM THE PHASE 1 <br />TERMINATION OF NORTH FRONT AND CANNON STREETS TO THE PHASE 1 POND. <br />PHASE 1A IMPROVEMENTS SHALL INCLUDE AND ARE LIMITED TO THE FOLLOWING: <br />• CANNON STREET FLATWORK, PAVING, WET AND DRY UTILITIES AND WEST%: <br />LANDSCAPE IMPROVEMENT BETWEEN JOHNSON LANE AND LEONARD LANE. <br />• NORTH FRONT STREET FLATWORK, PAVING, WET AND DRY UTILITIES AND <br />LANDSCAPE IMPROVEMENT BETWEEN JOHNSON LANE AND LEONARD LANE. <br />• LEONARD LANE <br />• SANITARY SEWER AND ASSOCIATED PRIVATE SERVICES WITHIN LEONARD LANE <br />• TRACT E MEWS HARDSCAPE AND LANDSCAPE IMPROVEMENTS. <br />• THE LOOPED WATER MAIN AND ASSOCIATED PRIVATE SERVICES. <br />• THE REGIONAL STORM MAIN REALIGNMENT FROM THE ENTRY ON-SITE TO THE <br />TIE LOCATION AT CANNON STREET. TEMPORARY DRAINAGE SWALES FOR THE <br />PHASE 1A TERMINATION OF NORTH FRONT AND CANNON STREETS TO THE <br />PHASE 1A POND. <br />PHASE 2 IMPROVEMENTS SHALL INCLUDE AND ARE NOT LIMITED TO THE <br />FOLLOWING: <br />• CONSTRUCTION AND IMPROVEMENTS WITHIN THE NAWANTY GREENWAY <br />INCLUDING DRAINAGE AND PUBLIC AMENITIES. <br />• CANNON STREET FLATWORK, PAVING, WET AND DRY UTILITIES AND LANDSCAPE <br />IMPROVEMENT WITHIN THE EXTENSION OF CANNON STREET TO SOUTH STREET. <br />• SHORT STREET FLATWORK, PAVING, WET AND DRY UTILITIES AND NORTH'/: <br />LANDSCAPE IMPROVEMENT WITHIN THE EXTENSION AND RECONSTRUCTION <br />FROM HWY 42 TO CANNON STREET. <br />• LAFAYETTE STREET FLATWORK, PAVING, WET AND DRY UTILITIES AND <br />LANDSCAPE IMPROVEMENT BETWEEN CANNON STREET AND SHORT STREET. <br />• PRIVATE IMPROVEMENTS WITHIN RESIDENTIAL AREAS. <br />• EXTENSION OF NORTH FRONT STREET SOUTH TO SOUTHERN MU -R. <br />GENERAL PHASING NOTES: <br />1. RETAINING WALLS MAY BE REQUIRED FOR THE DEVELOPMENT OF THE PROJECT TO THE STANDARDS AND REQUIREMENTS OF <br />THE CITY, DEVELOPER AND MARKET NEEDS. WALLS WITHIN PRIVATE TRACTS/LOTS, ETC SHALL BE MINIMIZED TO 3', TO THE <br />EXTENT PRACTICAL. IF FEASIBLE, PRIVATE WALLS SHALL BE TIERED. <br />2. THERE ARE NO OFF-SITE REGIONAL IMPROVEMENTS REQUIRED FOR THIS PROJECT. OFF-SITE REGIONAL IMPROVEMENTS <br />BEYOND THOSE DEPICTED WITHIN THIS DOCUMENT SHALL BE BY OTHERS. <br />3. CONSTRUCTION OF THE IMPROVEMENTS AND ALL USES MAY OCCUR IN ANY ORDER AND IS NOT LIMITED EXCEPT AS <br />REQUIRED TO PROVIDE A LOOPED WATER SERVICE, SANITARY SERVICE, TWO POINTS OF EMERGENCY ACCESS AND THAT <br />NO "DEAD END" LONGER THAN 500' WITHOUT A SECONDARY EMERGENCY ACCESS, SHALL OCCUR. <br />4. IMPROVEMENTS ALONG AND WITHIN THE BNSF RIGHT-OF-WAY FROM GRIFFITH STREET TO SOUTH STREET SHALL BE <br />COORDINATED WITH THE CITY FOR INCLUSION WITHIN THE CITY'S AGREEMENT WITH BNSF TO ALLOW FOR CONSTRUCTION. <br />THOSE ITEMS INCLUDE FENCING, RETAINING WALLS, TRANSITIONAL GRADING AND DRAINAGE CONNECTIONS AND MAY BE <br />INCLUDED WITHIN THE FIRST PHASES OF THE DELO DEVELOPMENT, DEPENDING ON THE TIMING OF THE AGREEMENT. THE <br />DEVELOPER WILL REIMBURSE THE CITY FOR ANY DELO SPECIFIC FEES ASSOCIATED WITH THE BNSF PERMITTING. <br />5. THE EXISTING ACCESS TO THE COMCAST SITE WITHIN E. LAFAYETTE STREET ROW MUST BE MAINTAINED UNTIL <br />THE NORTH FRONT STREET ACCESS IS CONSTRUCTED AND OPERATIONAL. <br />6. NORTH FRONT STREET, LEONARD LANE AND THE ASSOCIATED UTILITIES IN THE VICINITY OF THE FUTURE E. <br />LAFAYETTE RIGHT-OF-WAY VACATION AND THAT CROSS THE COMCAST PARCEL SHALL BE CONSTRUCTED <br />PENDING AN AGREEMENT WITH COMCAST. INFORMATION DEPICTED HEREIN ASSUMES THE AGREEMENT <br />WITH COMCAST IS IN PLACE. ANY REQUIRED PHASING OF THE INFRASTRUCTURE AFFECTED BY THE <br />AGREEMENT SHALL BE DETERMINED WITH THE SUBSEQUENT PHASE 1A CONSTRUCTION DOCUMENTS. <br />7. PRIVATE IMPROVEMENTS SHALL NOT BE INCLUDED WITHIN THE DELO SUBDIVISION AGREEMENT. <br />8. NORTH FRONT STREET, LEONARD LANE AND THE ASSOCIATED UTILITIES IN THE VICINITY OF THE FUTURE E. <br />LAFAYETTE RIGHT-OF-WAY VACATION AND THAT CROSS THE COMCAST PARCEL SHALL BE CONSTRUCTED <br />PENDING AN AGREEMENT WITH COMCAST. ANY REQUIRED PHASING OF THE INFRASTRUCTURE AFFECTED <br />BY THE AGREEMENT SHALL BE DETERMINED WITH THE SUBSEQUENT PHASE 1A CONSTRUCTION DOCUMENTS. <br />DETENTION AND WATER QUALITY PHASING NOTES: <br />1. A TEMPORARY DETENTION AND WATER QUALITY FACILITY SHALL BE CONSTRUCTED ON-SITE TO SERVICE <br />DELO PHASE 1 IN THE EVENT THAT AN OFF-SITE FACILITY TO SERVICE THIS PHASE OF THE PROJECT ISN'T <br />AVAILABLE. THE DESIGN AND SPECIFICS SHALL BE PRESENTED WITHIN THE SUBSEQUENT PHASE 1 <br />CONSTRUCTION DOCUMENTS. <br />2. IN THE EVENT THAT AN OFF-SITE FACILITY TO SERVICE THIS PROJECT IS NOT AVAILABLE AT THE TIME OF THE <br />DEVELOPMENT OF DELO PHASE 1A A TEMPORARY OR PERMANENT DETENTION AND WATER QUALITY <br />FACILITY SHALL BE CONSTRUCTED ON-SITE TO SERVICE DELO PHASE 1 AND PHASE 1A. THE POND MAY BE <br />CONSTRUCTED IN A PERMANENT CONFIGURATION IN THE EVENT THAT THE TIMING OF THE OFF-SITE <br />FACILITY IS NOT ADVANTAGEOUS TO THE DELO DEVELOPMENT. THE DESIGN AND SPECIFICS SHALL BE <br />PRESENTED WITHIN THE SUBSEQUENT PHASE 1A CONSTRUCTION DOCUMENTS. <br />3. FUTURE DELO PHASE 2 FINAL PLANNED UNIT DEVELOPMENT SHALL PLAN FOR AND THE SUBSEQUENT <br />CONSTRUCTION DOCUMENTS SHALL EVALUATE AND DESIGN THE REQUIRED DETENTION AND WATER <br />QUALITY VOLUME FOR THAT PHASE. AT THAT TIME, SHOULD THE OFF-SITE REGIONAL DRAINAGE FACILITY <br />NOT BE COMPLETED, A DETERMINATION TO DESIGN AND CONSTRUCT AN PERMANENT ON-SITE FACILITY <br />SHALL OCCUR. <br />4. WITH THE DEVELOPMENT OF THE OFF-SITE DRAINAGE FACILITY TO SERVICE THE REDEVELOPMENT AREA <br />AND THE DELO PROJECT, THE TEMPORARY DETENTION AND WATER QUALITY FACILITIES SHALL BE <br />REMOVED AND THE DEVELOPMENT OF A PUBLIC GREENWAY SHALL OCCUR. <br />P <br />anning & la <br />000 <br />people creating spaces <br />pcs group, inc. <br />1001 16th street, 3B-180 <br />Denver, CO 80265 <br />tel (303) 531-4905 <br />www.pcsgroupco.com <br />e ineering_ <br />ENGINEERING <br />1‘4, <br />h'"' CONSULTANTS <br />Contact: Jason D. Margraf, PE <br />950 Spruce Street, Ste 2C <br />Louisville, CO 80027 <br />ph:(303) 368-5601 <br />fx: (303) 368-5603 <br />Q <br />1" = 80' <br />scale <br />north <br />sheet title <br />Phasing Plan <br />submittal <br />no <br />owner's rep_ 1 <br />RMCS, Inc. <br />950 Spruce St. <br />Ste 2A <br />Louisville, CO <br />80027 <br />720.524.3620 <br />2 <br />3 <br />date <br />11-7-2013 <br />1-30-2014 <br />4-14-2014 <br />designed by: SOS <br />checked by: JDM <br />architecture <br />studio <br />architects <br />950 Spruce Street, Ste 2D <br />Louisville, CO 80027 <br />ph:(303) 442-5882 <br />fx: (303) 442-5888 <br />WWW.kgarch.com <br />0 <br />description <br />initial submittal <br />second submittal <br />third submittal <br />drawn by: SCD <br />project #: 030009 <br />sheet <br />5 <br />of <br />21 <br />