Laserfiche WebLink
J SAUNDERS <br />Louisville Recreation / Senior Center Expansion <br />City of Louisville <br />Amendment #02 <br />CLARIFICATIONS, ASSUMPTIONS, <br />EXCLUSIONS, ALTERNATES & ALLOWANCES <br />November 10, 2017 <br />ESTIMATE BASIS <br />1. This estimate is based upon the following documents and information: <br />a. BID PACKAGE #2 — Recreation and Senior Center Expansion Drawings Vol 1 for the Project as <br />prepared by Sink Combs Dethlefs, dated September 29, 2017. <br />b. BID PACKAGE #2 — Recreation and Senior Center Expansion Drawings Vol 2 for the Project as <br />prepared by Sink Combs Dethlefs, dated September 29, 2017. <br />c. BID PACKAGE #2 — Recreation and Senior Center Expansion Specifications (Project Manual) <br />Vol 1 for the Project as prepared by Sink Combs Dethlefs, September 29, 2017. <br />d. BID PACKAGE #2 — Recreation and Senior Center Expansion Specifications (Project Manual) <br />Vol 2 for the Project as prepared by Sink Combs Dethlefs, September 29, 2017. <br />e. BID PACKAGE #2 ADDENDUM #1— Recreation and Senior Center Expansion Drawings for the <br />Project as prepared by Sink Combs Dethlefs, dated October 13, 2017. <br />f. BID PACKAGE #2 ADDENDUM #1— Recreation and Senior Center Expansion Narrative for the <br />Project as prepared by Sink Combs Dethlefs, October 13, 2017. <br />BID PACKAGE #2 ADDENDUM #1— Recreation and Senior Center Expansion Specifications <br />(Project Manual) for the Project as prepared by Sink Combs Dethlefs, October 13, 2017. <br />h. BID PACKAGE #2 — Memory Square Improvements Drawings for the Project as prepared by <br />Sink Combs Dethlefs, dated September 29, 2017. <br />i. BID PACKAGE #2 — Memory Square Improvements Specifications (Project Manual) for the <br />Project as prepared by Sink Combs Dethlefs, September 29, 2017. <br />BID PACKAGE #2 ADDENDUM #1— Memory Square Improvements Drawings for the Project <br />as prepared by Sink Combs Dethlefs, dated October 13, 2017. <br />k. BID PACKAGE #2 ADDENDUM #1— Memory Square Improvements Narrative for the Project <br />as prepared by Sink Combs Dethlefs, October 13, 2017. <br />I. BID PACKAGE #2 ADDENDUM #1— Memory Square Improvements Specifications (Project <br />Manual) for the Project as prepared by Sink Combs Dethlefs, October 13, 2017. <br />2. Saunders Construction excludes the following reports as construction documents. These reports <br />provide many recommendations and options that may or may not be approved and used on this <br />project. Therefore, only the work specifically detailed by the construction documents is included. <br />a. Geotechnical Evaluation as prepared by Ground Engineering, dated April 6, 2017. <br />b. Geotechnical Evaluation as prepared by Ground Engineering, revised June 7, 2017. <br />g. <br />J. <br />Saunders Construction, inc. <br />Page 1 of 16 <br />24 <br />11/10/2017 <br />