My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2015 08 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2015 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2015 08 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 1:25:21 PM
Creation date
7/9/2020 11:19:54 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
8/13/2015
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />August 13, 2015 <br />Page 17 of 22 <br />120,581 SF general flex space (flex means office/warehouse use). If used exclusively for <br />office, the loading dock areas become parking. <br />72% hardscape and 28% soft scape which exceeds IDDSG requirement <br />4 access points: Two off Taylor, one off CTC Blvd, one on S. 104" <br />2 spaces per 1,000 SF 3.47 spaces per 1,000 SF 419 spaces <br />(242 spaces) <br />4 spaces per 1,000 SF 4.38 spaces per 1,000 SF 528 spaces <br />(483 spaces) <br />The building is almost 700' in length, fagade articulates which means it steps back, <br />creating areas to break up the fagade. <br />Monument Signs: IDDSG allows one freestanding sign for each access. Applicant is <br />requesting 4 monument signs. <br />Wall Signs -waiver: IDDSG allows 15 sf wall signs, not to total more than 80 sf. <br />Applicant is proposing 40 sf signs not to total more than 120 sf. <br />Materials board entered in record by Tengler, seconded by Russell. Passes by voice vote. <br />Staff Recommendations: <br />Staff recommends Planning Commission move to approve 2000 Taylor —GDP Amend and <br />Final PUD: Resolution 23, Series 2015. A request for an amendment to the existing Business <br />Center at CTC General Development Plan (GDP) and a rezoning from PCZD-C, to PCZD-I, and <br />a final planned unit development (PUD) plan to construct a 120,581 SF single story Industrial/ <br />Flex building with associated site improvements at Lot 1, Block 4, the Business Center at CTC <br />with no conditions. <br />Commission Questions of Staff.- <br />Tengler says the rezoning makes sense. I wonder if the original zoning wasn't done to maintain <br />some sort of a balance between different uses? Does this rezoning impact cause any concerns? <br />McCartney says regarding the PZCD-I specifically states that all industrial standards are <br />allowed. The only difference at CTC in Industrial is permit by right such as restaurant which is <br />allowed as a SRU. This property would allow for a restaurant use. The applicant has been the <br />owner throughout this history, so perhaps the applicant can answer your question. <br />Applicant Presentation: <br />Jim Vasbinder, Etkin Johnson Real Estate Group, 1512 Larimer Street, Suite 325, Denver, CO <br />Vasbinder pulls up an overhead aerial. We have two items on this particular property that we <br />are asking you to review and approve. One is the rezoning. Vasbinder says the rezoning goes <br />back to 1976 when a portion of CTC when it was annexed into the City was designated as <br />commercial. Etkin Johnson has been actively involved with a partner or ourselves since 1997. <br />We have never seen one commercial use was a viable use that we actually got to the point <br />where "let's do a deal." We have been very successful with our industrial projects in CTC. We <br />are approaching 900,000 sf, and with this building, we will be over 1,000,000 sf. We have been <br />blessed over the last 2 to 2.5 years that before it is finished, the building is leased. A lot of this is <br />market conditions but we really attribute it to two things: the climate that the City of Louisville <br />and the County of Boulder has created; and our product because our buildings are well received <br />and very flexible. We can put lots of different users in these boxes. We have hi -tech companies, <br />food processing companies, and graphic packaging. All of these companies bring a great <br />amount of vitality and income to us as well as the City and the region. The 2000 Taylor building <br />is similar to the building across the street. The recently completed building to the west is <br />
The URL can be used to link to this page
Your browser does not support the video tag.