Laserfiche WebLink
Project Name: SBR Ditch Lining Submitted By: Public Works Version: 3/3/2020 <br />Program(s): Sub-Program(s): Funding Source(s): Percent <br />Utilities Water Water Utility Fund 1000, <br />100°/ <br />-.. <br />Equipment or <br />Year 1 <br />Year 2 <br />Year 3 Year 4 <br />Year 5 Year 6 <br />Six -Year <br />Project Costs <br />2021 <br />2022 <br />2023 2024 <br />2025 2026 <br />Total <br />Land Acquisition <br />- <br />- <br />- - <br />- - <br />- <br />Design & Engineering <br />- <br />- - <br />- <br />Other Prof Services <br />- <br />- <br />- - <br />- - <br />- <br />Construction <br />85,000 <br />190,000 <br />125,000 <br />- - <br />400,000 <br />Other Equip/Project Costs <br />- <br />- <br />- - <br />- - <br />- <br />Capital Equipment Purch <br />- <br />- <br />- <br />- <br />- <br />Contingency <br />12,750 <br />28,500 <br />18,750 - <br />- - <br />60,000 <br />97,750 <br />218,500 <br />143,750 - <br />- - <br />460,000 <br />Total Costs (Gross) <br />Grants or Other <br />Off -Setting Revenue <br />- <br />- <br />- - <br />- - <br />Impact to Annual <br />Maint/Operating Costs <br />- - <br />- <br />P <br />Description & Proposed Funding: <br />uipment/Project Description: <br />is project includes installation of a culvert lining system to reinforce <br />it ditch crossings on South Boulder Road. <br />Ivert 1 (Cottonwood Park) Goodhue Ditch - 2021 <br />Ivert 2 (East of Main Street) Goodhue Ditch - 2022 <br />Ivert 3 Louisville Lateral - 2023 <br />Project revenue or grants that will support the project and the <br />impacts to the operating budget: <br />No grants have been identified at this time that may be used to support <br />Reference to Plan being implemented (i.e., Master Plan): <br />Justification and Alignment with Program/Sub-Program Goals & Key Performance Indicators: <br />Project will help protect South Boulder Road from potential pipe collapse providing a safe, well maintained transportation system. The <br />project will extend the life of the existing culverts and prevent having to open trench cut a busy arterial road. Project need was identified <br />through City and Ditch Company assessment. Need is due to rusted metal culverts that are at the end of their service life. <br />Department Priority Ranking: Medium Request Number: (Finance Use) <br />