Laserfiche WebLink
SUBJECT: RESOLUTION NO. 47, SERIES 2021 <br />DATE: JULY 20, 2021 PAGE 3 OF 13 <br />Figure 1: St Louis Parish and Bolder Innovation Campus Filing 2 <br />S <br />, <br />00 <br />I <br />1 a.fArM'. MEA <br />I <br />Parcel 1 A <br />nt 1 i <br />\I LOTE�ROLK+ 1' <br />1 1 � <br />leT. P.n.l.a <br />ewal. as' .a <br />O� mcrolfp oxslrE <br />! oETexrloxE uo jroni. <br />u px.ry�gE EN/, r0 Crtv <br />SHI Ex�� u,i�i,v Emu <br />AGGE59 Eilf' in BGTH-_"NIGE� <br />1 <br />mEq <br />qaER,RAFFlC Er viNCLvpNG. -_. <br />.uL�WEIEH�Vq ProVEHEHT I.IMNlvG9 <br />Right in/Right out <br />Access <br />I <br />SHI Ex�� u,i�i,v Emu <br />AGGE59 Eilf' in BGTH-_"NIGE� <br />1 <br />mEq <br />qaER,RAFFlC Er viNCLvpNG. -_. <br />.uL�WEIEH�Vq ProVEHEHT I.IMNlvG9 <br />Right in/Right out <br />Access <br />I <br />R <br />V IaJ. .IQIILGM 1 U11 <br />Movement Access <br />Final PUD <br />The PUD proposes development of an industrial building on Lot 1. Primary access is <br />accommodated from the east -west private drive constructed with Filing 1 and a <br />continuation of the north -south internal private drive. The PUD and plat also establish the <br />right in/right out southern access point to S. 96t" Street. The 8-foot detached sidewalk is <br />continued along the S. 96t" Street frontage adjacent to lots 2 through 4. <br />The proposal includes improvements to the right-of-way of S. 96t" St to accommodate the <br />new right in/right out at the southern side of Filing 2. Previous approvals authorized <br />construction of a traffic signal at the main full movement access drive. <br />CITY COUNCIL COMMUNICATION <br />5 <br />