My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2021 12 07
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2021 City Council Agendas and Packets
>
City Council Agenda and Packet 2021 12 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 8:18:50 AM
Creation date
12/6/2021 4:45:58 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
12/7/2021
Doc Type
City Council Packet
Original Hardcopy Storage
9C3
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Conflict Monitor (CMU}/Malfunction Management Unit (MMU}: <br />The Contractor shall check voltage monitor operation by turning off, or disconnecting, the <br />controller. Check red fail operation by removing a load switch or flash transfer relay. Check <br />for conflicts and conformance to NEMA specifications. Report problems to the Owner. <br />Computerized testing using an ATSI approved tester may be performed at the Owner's request <br />and charged as per unit pricing. Computerized test results shall include monitor location, <br />manufacturer, model, serial number, tests completed, and test date. The technician shall review <br />these results and check for conformance with tester standards. Copies of test results shall be <br />left in the cabinet. <br />6. Uninterruptible Power Supply (UPS): <br />The Contractor shall check the UPS for proper operation by disconnecting the power source. <br />Where the UPS functions properly, the power source shall remain disconnected for a period of <br />no less than 5 minutes. Where the UPS fails operation, the power source shall be reconnected <br />with the signal restored to normal operation. Additional checks shall be made using a battery <br />load tester. Report problems to the Owner. <br />7. Coordination: <br />The Contractor shall check telephone lines, interconnect, and all associated equipment for <br />proper operation. Check for proper controller manipulation by use of holds, force off, max 2, <br />etc. Check all settings per data sheet. Check clock on coordination equipment and reset if <br />necessary. Report problems to the Owner. <br />8. Preetyzpt: <br />The Contractor shall test railroad preempt for proper operation with a test switch or by <br />removing or jumping input as required. The Contractor shall test emergency vehicle <br />preemption by use of an emitter from proper distance. Report problems to the Owner. <br />9. Detection: <br />The Contractor shall check for proper operation of all vehicle detection. <br />Inductance Loops -- Check vehicle detection for proper operation; re -tune detector <br />amplifiers if necessary. Check loop splices; re -splice inductance loops if necessary and <br />if the water valve boxes and/or pull boxes are readily accessible. Check detector <br />amplifier settings, including extend/delay function settings, and make setting <br />adjustments as necessary to maximize detection operation based on the Owner's <br />specifications. Make cursory checks regarding the general condition of the inductance <br />loops, surrounding pavement, and water valve boxes. Report pavement failures related <br />to existing or imminent loop failures to the Owner. Report damaged, missing, buried, <br />raised and/or sunken water valve boxes, water valve box Iids, and/or pull boxes to the <br />Owner. Report problems to the Owner. <br />Where vehicle detection is failed, the Contractor shall place the vehicle detection's <br />associated vehicle phase on maximum recall and immediately notify the Owner. <br />Video Detection — Check vehicle detection for proper operation. Conduct a cursory <br />check of the attachment hardware. Check video quality. Check cameras for proper <br />alignment. Clean camera lenses. Report problems to the Owner. <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.