My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2009 07 21
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2009 City Council Minutes
>
City Council Minutes 2009 07 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:44:28 PM
Creation date
9/8/2009 10:20:57 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
7/21/2009
Original Hardcopy Storage
7D4
Supplemental fields
Test
CCMIN 2009 07 21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City Council <br />Meeting Minutes <br />July 21 , 2009 <br />Page 7 of 9 <br /> <br />City Attorney Light read Ordinance No. 1554, Series 2009. <br /> <br />MOTION: Mayor Sisk moved Ordinance No. 1554, Series 2009, be approved on <br />first reading and sent out for publication and a public hearing be set for August <br />18, 2009, seconded by Councilor Clabots. All in favor. <br /> <br />RECREATION CENTER MECHANICAL SYSTEM REPLACEMENT - REJECT <br />ALL BIDS AND AUTHORIZE NEGOTIATIONS WITH QUALIFIED BIDDERS <br /> <br />Mayor Sisk requested a Stafir presentation. <br /> <br />Public Works Director Phare explained the heating and cooling system for the <br />Recreation Center consists of 14 roof top units and one climate control unit for <br />the pool area. The equipment is approaching 20 years of service and has <br />reached the end of its useful life. The goal is to install an energy efficient <br />mechanical system and controls to resolve heating and cooling issues. The pool <br />climate control unit is being purchased under a separate contract. <br /> <br />The original scope of the project was to replace the existing mechanical units <br />with ones that were equivalent in size and met minimum energy efficiency <br />standards. The scope was considerably expanded to include a number of items <br />to address energy efficiency, comfort, safety and schedule. It was decided the <br />installation of the mechanicall system and PoolPak replacement along with the <br />roof replacement would minimize damage to the new roof and integrate the <br />various mechanical system components and controls. Another priority for the <br />work was to minimize disruption to Recreation Center customers and employees <br />by scheduling work during maintenance week, August 23 - 31. <br /> <br />The City received three bids from pre-qualified contractors with the lowest <br />qualified bid being significantly higher than the budget and initial estimates. A <br />number of items included in the base bid may be value engineered to reduce the <br />cost, while maintaining the primary goals of the project. The additional funds <br />needed to complete the work: as bid, is $291 ,000. Staff identified possible <br />sources of additional funds in the CIP through postponement or elimination of <br />currently funded projects or use of available fund balance. There are also <br />available funds in the Building Maintenance Fund. <br /> <br />PUBLIC COMMENT <br /> <br />David Norman, a Louisville rHsident, asked if there is a downside to delaying the <br />resurfacing of the Recreation Center parking lot. He also noted the gym floor has <br />been wet as a result of a leaky roof. Public Works Director Phare stated there is <br />little downside in deferring parking lot maintenance. City Crews have patched <br />areas in the spring and will do so in the fall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.