Laserfiche WebLink
<br />Howard moved that Council forward the Amended Final PUD Development Plan for a Two-Story <br />Addition and Enclosure of an Outdoor Patio - 732 Main Street - the Melting Pot Restaurant to the <br />Planning Commission, seconded by Keany. All in favor. <br /> <br />DISCUSSION/DIRECTION - FINAL pun DEVELOPMENT PLAN FOR CARRABBA'S <br />IT ALlAN RESTAURANT - ILOT IB - CENTENNIAL V ALLEY PARCEL H <br /> <br />Davidson called for staff presentation. <br /> <br />Paul Wood, Planning Director, stated that Carrabba's Italian Grill has flIed an application for a Final <br />PUD Development Plan to construct a full-service restaurant on Lot 1 B Centennial Valley, Parcel <br />H, which is located immediately to the east of Ruby Tuesday's, fronting onto Dillon Road. <br /> <br />The PUD proposes a building area of 6,645 sf, which results in a (Floor Area Ratio) FAR of <br />approximately .10, based upon a lot are:a of 66,598 sf. The PUD, if authorized, would not exceed the <br />, Average Floor Area Ratio' of .27, as a!llocated to Parcel H by the Sixth Amendment to the: Amended <br />and Restated Development Agreement approved in March of 1996. <br /> <br />The PUD proposes a total of 93 parking spaces. A total of 99 spaces are required based upon the <br />Commercial Design Development Standards and Guidelines (CDDSG) requirement of 15 spaces per <br />1,000 sf. The applicant's request letter indicates that an additional 25 spaces to be used primarily for <br />employee parking are being requested from the owner of Lot 6B. The spaces are to be for the <br />exclusive use of Carrabba' s and not a cross-parking agreement. While the spaces are within 300 feet <br />of the proposed building, the applicant has not addressed how those will be secured and enforced. <br />. . <br />Seating capacity of the restaurant is 230 patrons. <br /> <br />Based upon gross lot area, the PUD proposed 26% landscaping on site, which is less than the 30% <br />required under the CDDSG. That shortfall equates to a deficit of approximately 2,600 sf of open <br />space. Based upon a CDDSG requirc~ment that 75% of the open space be green scape, there is a <br />deficit of approximately 4,800 sf of on-site landscaping. There is an additional 1,996 sf of landscape <br />area installed on the exterior porches of the building. The applicant is requesting authorization to <br />apply the landscaping on the roof, as well as an off-site 2,125 sf of landscaping on Tract C toward <br />the landscape requirement. Tract C is a privately owned and maintained detention facility. The City <br />has not granted off-site landscape credits to PUD applicants, although Quality Inn Suites had <br />requested credit from Tract D. <br /> <br />The proposed building orientation and architecture calls for the front of the building to face south, <br />the entrance to face west, backing the rear/service area to face Dillon and the primary access <br />easement into Parcel H from Dillon Road. The south and west building elevations are constructed <br />of a reddish brick, while the east and north elevations reflect a simulated stone and EFIS exterior <br />finish. Overall building height is 19', with the extended parapet wall shown as part of the south <br />building elevation at 26'. <br /> <br />21 <br />