Laserfiche WebLink
the minimum requirement. The architectural and landscape image presented to McCaslin remains <br />strong and parking should be effectively screened from view with proposed landscaping and <br />building. <br /> <br />The pedestrian connections through the site exceed existing PUD requirements. For a small site, a <br />fairly prominent entry drop-off area has been defined on the east side of the building. Bench seating <br />has been provided at the main entry, as has the required bike parking. <br /> <br />Parking is provided for 77 vehicles, 5 below what was originally proposed in the overall Century <br />Office Park PUD. However, because the restaurant is smaller in both area and seating than originally <br />approved, it exceeds both the 11.7 ratio and the one-space-per-three-seat requirement in effect at the <br />time the Century Office Park PUD was approved. Planning Commission is recommending that the <br />applicant continue to pursue a possible parking arrangement with the adjacent bank. The applicant <br />has indicated that he is in contact with bank representatives with the intent to establish such an <br />arrangement. <br /> <br />The application is generally consistent with the PUD in general design intent and materials palette. <br />Brick is the primary material with E.I.F.S. trim panels bordering the windows. Although E.I.F.S. is <br />not an approved material in the Century Office Park PUD, the applicant seems to have successfully <br />integrated E.I.F.S. into the overall design of the building in a manner that is consistent with the <br />Century Office Park PUD. Planning Commission did not raise any objections to utilizing E.I.F.S. <br /> <br />Planning Commission recommended providing more visual and pedestrian scale interest to the west <br />elevation. The applicant has modified the elevation to include a clerestory, exposed roof rafters, and <br />a row ofbollards with a chain strung between. Staff recommends removing the bollards and chain <br />from the plans. <br /> <br />The landscaping materials proposed are generally consistent with those approved on the original <br />PUD. Tree quantities exceed the approved Final PUD requirements by twenty-three. Planning <br />Commission recommended that the applicant approach a deciduous to evergreen shrub ration of 3:1. <br />The revised landscape plan represents a good faith effort to reach the recommended ratio while still <br />accomplishing adequate screening of the parking lot from McCaslin. The perennial bed at the site <br />entrance from McCaslin should be increased in area by a factor of two, and graphic symbols for each <br />four planting categories should be indicated on the landscape plan. <br /> <br />Signage was specifically not authorized for this site on the original Final PUD approval. The <br />applicant is proposing a wall sign on both the east and west elevations. Facing McCaslin, the sign <br />would be two-feet tall and ten-feet long. The west elevation sign would be the same height but would <br />be eight-feet long. Both signs will be backlit individual channel letters and logo. A one-foot by two- <br />foot illuminated menu cabinet is proposed for the east elevation at the building entrance. The <br />dimensions of the menu cabinet should be correctly noted on the east elevation detail as it is on the <br />site plan. <br /> <br />5 <br /> <br /> <br />