Laserfiche WebLink
The proposed shared access point on the southside of the site is encouraged in the <br />IDDSG and will be maintained via a private, ingress -egress easement on the site to the <br />south. The parking lots include two-way drive aisles accessing the 90 degree parking on <br />the east side of the building and the customer loading area to the south. To meet the <br />requirements of the Louisville Fire Protection District, an access lane and hammerhead <br />turn -around are provided at the west end of the site. A trash enclosure is located at the <br />southwest corner of the site. <br />The site and use are generally auto oriented, so pedestrian paths and a plaza space are <br />provided adjacent to the building and at the building entrance as required by the <br />IDDSG, while an internal pedestrian path connects the site to the existing attached <br />sidewalk on S Pierce Avenue. <br />The proposal includes eleven vehicle parking spaces and three vehicle loading spaces, <br />which is below the required amount for a warehouse and office use in the industrial <br />zone district. A parking reduction request has been made by the applicant based on the <br />parking needs of nondwelling users (see below for further analysis). The applicant <br />asserts that, based on the nature of the use, the current parking layout will adequately <br />serve the guests and employees at the facility. The proposed number of spaces is in - <br />line with other storage facilities in the region. Electric Vehicle Charging Infrastructure <br />requirements are satisfied with one fully functioning charging stations, an electric <br />vehicle ready space and an electric vehicle capable space. <br />30 percent of the site is landscaped, which exceeds the 25 percent required by the <br />IDDSG. A waiver has been requested from Sec. 5.2.A.1 of the IDDSG which requires a <br />10-foot wide landscape buffer on the north property line with trees planted every 30 <br />linear feet for half the depth of lot. A storm drain is proposed in the area which will <br />preclude the planting of trees (see below for further analysis). The required buffer trees <br />are proposed elsewhere on site for a total of 39 trees. A total of 148 low-water shrubs <br />and grasses are proposed along with native grass areas and a small section of turf <br />adjacent to the detention facility. <br />The building will be constructed of masonry, stucco, and architectural metal panels with <br />varying, massing, textures, and colors. Architectural trellises have been provided on the <br />primary fagade to enhance visual appeal of the building and compliment the prominent <br />corner entrance to the leasing office. The south elevation includes a recessed customer <br />loading entrance and direct storage unit access for commercial customers. The building <br />will be designed to accommodate between 530 and 640 storage units, pending final <br />interior designs. The elevations include variations in the parapet height and articulation <br />in the building fagade, which when combined with the variation in materials, create <br />architectural interest and appropriate design for the Industrial zone district. The color <br />palette will consist of neutral tan shades with accents of cedar red. <br />PUD-000477-2023 — 745 S Pierce Ave Page 3 of 11 <br />Planning Commission — June 13, 2024 <br />19 <br />