My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-71
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2025 Resolutions
>
Resolution 2025-71
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 12:09:41 PM
Creation date
9/19/2025 11:08:48 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
APPROVING AN AGREEMENT WITH KIMLEY-HORN & ASSOCIATES FOR THE SOUTH STREET UNDERPASS PROJECT — OPTION B DESIGN
Meeting Date
9/16/2025
Doc Type
Resolution
Signed Date
9/16/2025
Ord/Res - Year
2025
Ord/Res - Number
71
City Property Name
Properties Underpasses
Quality Check
9/19/2025
Supplemental fields
Parties Involved
Kimley-Horn And Associates Inc
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Kimley»>Horn <br />Page e <br />Owner officials and authorities. T2ue will compile a list of all utility companies contacted for information and <br />note information received with contact information for each response and note non -response if applicable. <br />Field Utility Investigation (Utility Designation) <br />T2ue will utilize appropriate surface geophysical techniques to determine the approximate horizontal <br />position of utilities within the project area. Once designated (horizontally positioned), verified utilities are <br />marked using appropriate pink paint and flagging which is the standard industry color for temporary survey <br />markings. Utility type or ownership that cannot be confirmed by the field investigation will be termed <br />"unknown". T2ue will utilize a suite of equipment including pipe and cable locators (PCL), Ground <br />Penetrating Radar (GPR), magnetometers, and detectable sondes. If accessible, structures connected to <br />gravity -fed systems will be opened, and inverts will be measured. Invert information and, where accessible, <br />pipe size/material for the sewers will be collected at manholes/catch-basins from the surface and shown on <br />the drawings accordingly. The alignment of the sewer pipes will be shown on the drawing based on a <br />combination of record information received, results of the invert investigation, surveyed manholes/catch- <br />basins, and professional judgment. If chambers are full of water or confined space entry is required, extra <br />costs will be incurred and will be discussed with the Client in advance. <br />Survey <br />T2ue will survey the utility designation marks and utility appurtenances referenced to the project survey <br />controls. The results of this utility investigation and any survey work performed in conjunction with the <br />investigation will be tied to the project datum as specified by the client and existing survey grade control <br />points provided to T2ue for their use if available. In the absence of direction from the client or a control <br />diagram, T2ue will choose a Local Coordinate System based on either local or NAVD88 vertical datum. <br />T2ue will prepare a survey as depicted within the Project Limits. The following information will be located <br />and obtained for specific visible utilities where access is possible and safe for personnel: <br />• The alignment of non -visible underground utilities based upon the survey of surface designations <br />(markings) as performed by T2ue. <br />• Location of visible surface evidence of the various utility systems, such as utility poles, manholes, <br />inlets, catch basins, culverts, valves, and fire hydrants. <br />• The location of each main, pipe, conduit line, and other structures will be indicated based upon <br />safely observable evidence. <br />• Sanitary and Storm Sewers: Rim and invert elevations and/or flow of all manholes, inlets and catch <br />basins. <br />• Water Mains: location of all valves and hydrants. <br />• Gas Mains: location of valves. <br />• Telephone pedestals, electric pedestals, and transformers. <br />• Other visible utility surface features. <br />• The alignment of non -visible underground utilities based upon the survey of surface markings by <br />an underground utility locating service or utility companies. <br />• The Horizontal datum will be based upon Colorado State Plane North coordinates. <br />• Vertical datum will be based upon NAVD 88 (North American Vertical Datum of 1988). <br />kimley-horn.com <br />11800 Ridge Parkway, Suite 200, Broomfield, CO 80021 <br />303 228 2300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.