Kimley»>Horn <br />Page 8 <br />• A SUE Report signed and sealed by a Professional Engineer is excluded but can be provided at <br />an additional out -of -scope cost to the Client. <br />QLB/C/D Utility Investigation Assumptions, Exclusions, and Stipulations <br />• T2ue cannot guarantee that they will find all unknown, abandoned, retired, or inactive utilities. <br />• Individual utility services to homes and buildings will consist of water, electricity, and natural gas. <br />Telephone and CATV services are excluded but can be performed at an additional out -of -scope <br />cost to the Client. <br />• Underground storage tanks (USTs), septic fields, traffic loop systems, thrust blocks, cathodic <br />protection systems, drain tiles, irrigation channels, irrigation gates, irrigation valves, irrigation <br />piping, irrigation headwalls, and landscape irrigation two inches in diameter or less (both public & <br />private) are excluded. <br />• Utility vault dimensions and/or diagrams are excluded but can be performed at an additional out - <br />of -scope cost to the Client. <br />• Diagrams of the conduits within vaults are excluded but can be performed at an additional out -of - <br />scope cost to the Client. <br />• Overhead utility lines will be shown as a singular line running pole to pole. T2ue will attempt to <br />identify both ownership & connections on the poles and incorporate this information into the plans. <br />• Pole diagrams, images, and/or spreadsheets (or some combination thereof) as best suits this <br />project and existing site conditions are excluded but can be performed at an additional out -of - <br />scope cost to the Client. <br />• Butterfly diagrams or 3D modeling (with pipe networks) are excluded. <br />• The removal of Colorado 811 paint marks or designation marks is excluded. <br />• Right -of -entry to private property or access to secured areas is to be coordinated and granted to <br />T2ue. <br />• No utility coordination, utility relocation design, or conflict analysis will be performed as part of this <br />scope as it will be performed by Triunity. <br />• T2ue will provide traffic protection in accordance with local municipality specifications and permit <br />requirements. This item will be subcontracted to a local traffic control company. The fee provided <br />for this service is estimated based on quoted daily rates from the provider. <br />• Up to three (3) days of Traffic Control Flag men have been provided in the estimate for QLB <br />designating and survey of designations. <br />• The degree of success of a ground -penetrating radar (GPR) investigation is based entirely on the <br />composition of the soils and the depth and scale of subsurface targets. Electrically less -conductive <br />soils, such as quartz sands, typically allow for the detection of some utilities and/or their trenches <br />at depths greater than 10 feet. Electrically conductive soils, such as clay, moist silt, or saline soils, <br />typically preclude the investigation of targets deeper than three to six feet. Due to the unknown <br />receptiveness of specific site soils to the passage of radar energy, conclusive results cannot be <br />guaranteed from GPR. <br />QLA Investigation Assumptions, Exclusions, and Stipulations <br />• It is assumed that each hole will be excavated with the intent of finding one utility per hole. If <br />additional utilities are discovered within a hole, data for each additional utility will be collected and <br />a separate test hole report will be provided. Each test hole report for an unintended utility will be <br />billed as a reimbursable expense at $250/test hole report. <br />kimley-horn.com <br />11800 Ridge Parkway, Suite 200, Broomfield, CO 80021 <br />303 228 2300 <br />