Laserfiche WebLink
City Council <br /> Meeting Minutes <br /> February 7, 2012 <br /> Page 9 of 16 <br /> • Multi-Modal Street Design: Steel Street is designed with 46.5' of ROW to <br /> promote a "Livable" street and ROW. The street cross section will be designed <br /> for multi-modal purposes. <br /> • Public Land Dedication: The Preliminary Plat and PUD includes portions of <br /> previously platted areas (Lot 1, Block 10 of the Takoda Subdivision; and Lot 3A <br /> of the Davidson Highline Subdivision, replat) and 5.93 acres of previously <br /> unplatted area. Lot 3A and Lot 1, Block 10 are subject to public land dedication <br /> in the 5.93 acres of the Tebo/Dellacava Parcel. The applicant is proposing to <br /> dedicate a total of 1.4 acres towards public land dedication. <br /> • Davidson Highline Canal / Goodhue Ditch: Staff recommended the applicant <br /> continue to work with the ditch companies to insure their interests are met by <br /> Final Plat and PUD. <br /> • Burlington Northern/Santa Fe Noise mitigation: Steel Street right of way will be a <br /> buffer space for the residential units; multi-family units within 100 feet of the <br /> railroad right of way will incorporate noise mitigation enhanced wall construction <br /> and window specification. The nearest multi-family structure is located within 70 <br /> feet of the rail right of way. <br /> • Preliminary PUD Development Plan- Land Use: The property is zoned PCZD- <br /> C/R. The commercial component of the zoning is to allow for potential office use <br /> closer to South Boulder Road. The current preliminary PUD does not include a <br /> commercial component of the design scheme. <br /> • Bulk and Dimension Standards: The preliminary PUD is consistent with the GDP <br /> in reflecting the distribution of housing products and associated densities. The <br /> preliminary PUD also contains preliminary height and bulk standards along with <br /> typical character elevations of each of the proposed residential product types. <br /> • Height The preliminary PUD proposes the buildings be built to heights <br /> previously approved by the GDP: Single-family structures up to 35' in height and <br /> all Multi-family structures up to 55' in height. Each unit is an alley loaded model, <br /> no front garage loaded units, which increases the availability of on-street parking. <br /> • Phasing Plan: The phasing plan in the PUD reflects Planning Area 4B, the multi- <br /> family development built first in early summer of 2012. <br /> • Transportation: The primary access is from Hecla Drive and ultimately Hwy 42. <br /> Secondary access is proposed from South Boulder Road. South Boulder Road <br /> access would be for right-in only and full movement emergency egress. <br />