My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2011 10 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2011 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2011 10 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:20 AM
Creation date
5/7/2012 10:41:06 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCMIN 2011 10 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />October 13, 2011 <br />Page 6of 13 <br />Mountain Tennis Center. An infrastructure phasing plan for the remainder <br />40.95 acres is provided as required in the recorded general development <br />plan. Case No. 11-023-PS/PP. <br />Applicant and Representative: JLB Engineering Consultants <br />Owners: Colorado Tennis Facilities, LLC (Bill Boothby, GM); Adrian Games; and St. Louis Catholic <br />Parish in Louisville (Rev. G. Timothy Gaines) <br />Case Manager: Troy Russ, Director of Planning and Building Safety <br />Public Notice Certification: <br />Published in the Camera on September 25, 2011. Posted in City Hall, the Library, the <br />Recreation Center, the Police and Court Building and mailed to surrounding property <br />owners on September 23, 2011. <br />Conflict of Interest and Disclosure: <br />Sheets stated she is a member of the St. Louis Parish. <br />Staff Report of Facts and Issues: <br />Russ reviewed the application with the following information: <br />History and timeline of project from 2004 <br />2010 General Development Plan Agreement: all three parcels shall be plated <br />prior to division or development of any individual parcel. Also, the agreement <br />requires all public improvements and dedications be advanced concurrently <br />st <br />with the 1development request.” <br />Request summary: <br />Preliminary Plat and PUD for the entire 54-acres (Public <br />Improvements) <br />Details of the PUD <br />a.A 25-court, multi-surface, year-round, world class Tennis <br />Center on Tract 1. <br />b.Public Streets & Easements: Unique layout and meets <br />standards. <br />c.Public Land dedication: 5.5 acre dedication and 2.7 acre <br />payment-in-lieu <br />Land Use and Yard/Bulk Requirements <br />Parking: CDDSG requires 310 spaces <br />th <br />Access & Transportation: no sidewalk along 96Street <br />No sidewalk along Road B adjacent to Regional Trail <br />Staff supports the building height variance: <br />1)The building heights will not cast an increased shadow to adjacent <br />buildings/properties. <br />2)The land dedication of the recreational trail, Road B ROW, and BNSF ROW, <br />places the buildings over 200-feet from the properties in the CTC. <br />3)Views from the CTC properties will not be further deteriorated by the5-foot <br />addition. <br />4)The land used in the CTC allow for 40-foot building heights through the <br />IDDSG. <br />th <br />5)The buildings are placed over 300-feet to the east of 96Street ROW. <br />6)The City will receive landscaped enhancements for the public land <br />dedications. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.